53 North Moore Street
Manhattan, NY 10013BBL 1-00188-7503Map
Owner of record: Unavailable Owner
53 North Moore Street is a condominium built in 1910 in Manhattan, 10013. It has 46 residential units across 6 floors. The owner of record is Unavailable Owner. HPD has recorded 1 housing violation here, most recently on February 15, 2022.
- HPD violations
- 1
- DOB violations
- 60
- ECB violations
- 32
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 1
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 15, 2022
Closed — Violation dismissed
DOB building violations · 60
- No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 18, 2021
Dob violation - resolved - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2019)
Jun 29, 2020
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 13, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 13, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 13, 2020
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 28, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 28, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 27, 2019
Dob violation - resolved
Show 40 more ↓
- Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2018
Mar 18, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 28, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 28, 2018
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 13, 2017
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2015 inspection/test
Dec 1, 2016
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 28, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 27, 2014
Dob violation - resolved - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7b technical report by 08/21/2012
Aug 30, 2013
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7b technical report by 08/21/2012
Aug 30, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 4, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 18, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 2, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 2, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 2, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 16, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 16, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 16, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 16, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 6, 2007
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 6, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 6, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 6, 2007
Dob violation - resolved - Marquee other required
Cmq-marquee other required
Mar 20, 2007
Dob violation - dismissed - Marquee other required
Cmq-marquee other required
Mar 20, 2007
Dob violation - dismissed - Marquee other required
Cmq-marquee other required
Mar 20, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 30, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 30, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 30, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 15, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 15, 2005
Dob violation - resolved - Marquee other required
Cmq-marquee other required
Apr 15, 2005
Dob violation - dismissed - Marquee other required
Cmq-marquee other required
Apr 15, 2005
Dob violation - dismissed - Marquee other required
Cmq-marquee other required
Apr 15, 2005
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 29, 2004
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 22, 2003
Dob violation - resolved
ECB violations · 32
- Class - 2
Failure to submit an acceptable required cycle 9b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #912857. remedy: submit acceptable requ
Apr 11, 2024 · Penalty $1,250
Active - Class - 2
Failure to maintain building wall(s) or appurtenances. note-at the time of inspection observed crack and damaged mortar joint at bulkhead above 8th story(middle bldg). remedy:maintain exterior bldg wall or appu
May 15, 2023 · Penalty $1,250
Active - Class - 2
As per one two-module, modular slant fin gg-399 boiler. pressure range on compound gage not as per boiler code- flue pipe held together by tape-flue pipe metal gauge not as per boiler code-flue piping not seale
Aug 25, 2021 · Penalty $312
Resolve - Class - 2
Wrong rating tags on boiler. get correct rating tag. relief valves need to be vertical.
Oct 19, 2020 · Penalty $312
Active - Class - 2
Failure to maintain exterior bldg facade & appurtenances. at time of inspection observed at roof level loose & deteriorating coping stone south & west elevations. roof bulkhead has crached stucco masonary. reme
Sep 2, 2016 · Penalty $500
Active - Class - 2
Failure to file an acceptable sixth round technical report in compliance w/ code provisions: periodic insp. of exterior walls & appurtenances as required by article 28.302 & the d.o.b. rules & regulations.remed
Mar 29, 2010
Resolve - Class - 1
Licensed rigger failed to ensure scaffold worker met minimum requirements. noted 2 men on suspended scaffold exp #1. only 1 man has certificate of fitness from licensed rigger. remedy: comply with code.
Apr 23, 2009 · Penalty $1,600
Resolve - Class - 1
Failure to perform safe/proper inspection of suspended scaffold. noted: at 9am 2 men on scaffold 1 has no certificate of fitness,there are in adequate counter weights for outrigger beams & there are in adequate
Apr 23, 2009
Resolve - Class - 1
No record of daily inspection of suspended scaffold performed by authorized person at site. noted: at approx 9am 2 men on scaffold. no inspection records available for inspection. remedy: maintain daily inspect
Apr 23, 2009 · Penalty $2,400
Resolve - Class - 2
Work does not conform to approved construction documents. noted: suspended scaffold at exposure #1. approved plans show 40 counter weights to be used/2000 pds. there are 26 on 1 beam & 33 on other 50 pds each.
Apr 23, 2009
Resolve
Show 22 more ↓
- Class - 2
Failure to submit an acceptable 6th round technical report in compliance w/ code provisions periodic insp of exterior walls and appurtenances as required by article 28.302 and the dob rules & regulations rem: f
Nov 21, 2008 · Penalty $4,000
Resolve - Class - 2
Work does not conform to approved construction documents and or approved amendments. noted sidewalk shed does not have rear columns because of awning. there is no amended plans available. remedy: conform to
Nov 17, 2008 · Penalty $2,500
Resolve - Non-hazardous
83 86-removal of elevator without an equipmant use pemrit sign off certificate rem call 212 566 5524 to arrange an appiontment to finalize ebn 372-99
May 3, 2004 · Penalty $500
Resolve - Non-hazardous
83 83-removel of elevator without an equipmnet use permit signoff certifiate rem call 212 566 5524 to arrange for appointment to finalize ebn 374-99
May 3, 2004 · Penalty $500
Resolve - Non-hazardous
83 83-removal of elevator without an equipment use pemrit sign off certificate rem call 212 566 5524 to arrange for appointment to finalize ebn 374 99
May 3, 2004 · Penalty $500
Resolve - Non-hazardous
83 83-removal wihtout an equipment use permit sign off certificate remcall 212 566 5524 to arrange for appiontment to finalize ebn 373 99
May 3, 2004 · Penalty $500
Resolve - Non-hazardous
83 83-removal of elevator without an equipment use permit sign off certificate rem call 212 566 5524 to arrange an appointment to finalize ebn 373-99
May 3, 2004 · Penalty $500
Resolve - Non-hazardous
83 83-removal of elevator without an equipmnet use permit sig noff certificate rem call 212 566 5524 to arrange an appointment to finalize ebn 371-99
May 3, 2004 · Penalty $500
Resolve - Non-hazardous
83 83-removal of elevator without an equipment use pemrit sign off certificate rem call 212 566 5524 to arrange an appointment to finalize ebn 371-99
May 3, 2004 · Penalty $500
Resolve - Non-hazardous
83 83-removal of elevator without an equipmnet use of permit sign off certiifcate rem call 212 566 5524 to arrange an appiontment to finalize ebn 372-99
May 3, 2004 · Penalty $500
Resolve - Non-hazardous
85,u,05
Dec 30, 2003 · Penalty $350
Resolve - Non-hazardous
85,u,05
Dec 30, 2003 · Penalty $350
Resolve - Non-hazardous
85,u,05
Dec 30, 2003 · Penalty $350
Resolve - Non-hazardous
Failure to submit a 4th round technical report: periodic inspection ofexterior walls & appurtenances as required by ll 10 of 1980 & the deptof bldgs rules & regulations. remedy: file the required report.
Apr 23, 1999 · Penalty $2,500
Resolve - Hazardous
Failure to submit a fourth round technical report: periodic inspectionof exterior walls and appurtenances as required by local law 10 of 1980 and the department of buildings rules and regulations. file the requ
Feb 21, 1999 · Penalty $2,500
Resolve - Hazardous
Failure to submit a 4th round technical report: periodic inspection ofexterior walls & appurtenances as required by ll 10 of 1980 & the deptof bldgs rules & regulations. remedy: file the required report.
Nov 24, 1998 · Penalty $10,000
Resolve - Hazardous
Failure to submit a third round technical report: periodic inpsection of exterior walls and appurtenances as required by local law 10 of 1980 and the department of buildings rules and regulations. remedy:
Nov 6, 1998 · Penalty $10,000
Resolve - Hazardous
Failure to submit a fourth round technical report: periodic inspectionof exterior walls and appurtenances as required by local law 10 of 1980 and the department of buildings rules and regulations. remedy:
Nov 6, 1998 · Penalty $10,000
Resolve - Hazardous
Failure to submit a fourth round technical report: periodic inspection of exterior walls and appurtenances as required by local law 10 of 1980 and the department of buildings rules and regulations. remedy: file
Aug 13, 1998 · Penalty $2,500
Resolve - Hazardous
Failure to submit a fourth round technical report: periodic inspectionof exterior walls and appurtenances as required by local law 10 of 1980 and the department of buildings rules and regulations. remedy:
Jun 25, 1998 · Penalty $2,500
Resolve - Hazardous
Failure to submit a third round thenical report: periodic inspection of exterior walls and appurtenances as required by local law 10 of 1980 and the department of buildings rules and regulations. remedy: file
Apr 17, 1997 · Penalty $500
Resolve - Non-hazardous
Failrue to maintain. marquee at 1st story fast side. defect-metal roofing missing and broken. remaining corroded. remedy: repair above marquee
Aug 7, 1990 · Penalty $1,000
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (RM)
- Year built
- 1910
- Floors
- 6
- Residential units
- 46
- Building area
- 102,511 ft²
- Lot area
- 17,728 ft²
- Zoning
- C6-2A
- Community board
- 101
- Council district
- 1
- Block / lot
- 188 / 7503
- Assessed value
- $16,080,753
- Landmark / historic district
- Tribeca West Historic District
HPD registration #141911, last renewed Jul 24, 2026.
Questions about 53 North Moore Street
Who owns 53 North Moore Street?
The owner of record in NYC Department of City Planning PLUTO data is Unavailable Owner.
Does 53 North Moore Street have violations?
Yes. NYC HPD has recorded 1 housing violations at this property.
Is 53 North Moore Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 53 North Moore Street built?
City records list 1910 as the year it was built.
How many apartments are in 53 North Moore Street?
It has 46 residential units and 47 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.