374 Broadway
Manhattan, NY 10013BBL 1-00172-7501Map
Owner of record: Mandarin Plaza
374 Broadway is a condominium built in 1990 in Manhattan, 10013. It has 163 residential units across 24 floors. The owner of record is Mandarin Plaza. HPD has recorded 22 housing violations here, most recently on May 18, 2024. 12 of the 22 most recent violations are still open.
- HPD violations
- 22
- DOB violations
- 100
- ECB violations
- 56
- HPD complaints
- 103
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 22
- CImmediately hazardous
Remove device preventing door from being self-closing kick stand at building entrance door at public hall, 1st story
May 18, 2024
Closed — Violation closed - CImmediately hazardous
Remove device preventing door from being self-closing kick stand at vestibule door at public hall, 1st story
May 18, 2024
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 10d, 10th story, 2nd apartment from west at north
Jan 3, 2024 · Apt 10D
Closed — Violation closed - BHazardous
Remove all obstructions and repair all defects in wasteline pipe at wash basin in the 1st bathroom from north located at apt 23f, 23rd story, 1st apartment from south at west
May 17, 2023 · Apt 23F
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective floor tiles. in the 1st room from north located at apt 23f, 23rd story, 1st apartment from south at west
May 17, 2023 · Apt 23F
Open — Nov sent out - BHazardous
Provide adequate supply of hot water for the fixtures at sink. in the kitchen located at apt 23f, 23rd story, 1st apartment from south at west
May 17, 2023 · Apt 23F
Open — Nov sent out - BHazardous
Provide adequate supply of cold water for the fixtures at sink. in the kitchen located at apt 23f, 23rd story, 1st apartment from south at west
May 17, 2023 · Apt 23F
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over the celing at public hall, 25th story
Sep 27, 2021
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective fire retardent marterials at ceiling at public hall, 25th story
Sep 27, 2021
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 25th story
Sep 27, 2021
Closed — Violation dismissed
Show 12 more ↓
- BHazardous
Trace and repair the source and abate the visible mold condition... at wood floor in the 2nd room from east located at apt 6f, 6th story, 1st apartment from south at west
Jul 9, 2021 · Apt 6F
Open — First no access to re- inspect violation - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from east located at apt 6f, 6th story, 1st apartment from south at west
Jul 9, 2021 · Apt 6F
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood vanity wash basin in the bathroom located at apt 6f, 6th story, 1st apartment from south at west
Jul 9, 2021 · Apt 6F
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 6f, 6th story, 1st apartment from south at west
Jul 9, 2021 · Apt 6F
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from east located at apt 6f, 6th story, 1st apartment from south at west
Jul 9, 2021 · Apt 6F
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Closed — Violation dismissed - BHazardous
Provide adequate supply of cold water for the fixtures at bathtub in the bathroom located at apt 9b, 9th story
Feb 27, 2018 · Apt 9B
Open — Nov certified late - BHazardous
Provide adequate supply of cold water for the fixtures at sink in the kitchen located at apt 9b, 9th story
Feb 27, 2018 · Apt 9B
Open — Nov certified late - CImmediately hazardous
Properly repair with similar material the broken or defective wood flooring in the 3rd room from east located at apt 5g, 5th story, 2nd apartment from east at south
Aug 17, 2012 · Apt 5G
Closed — Violation closed - CImmediately hazardous
Trace and repair the source and abate the nuisance consisting of mold ... at water damage wood flooring in the 3rd room from east located at apt 5g, 5th story, 2nd apartment from east at south
Aug 17, 2012 · Apt 5G
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at , at public hall, 1st story
Aug 17, 2012
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood tile floor water damage in the entire apartment located at apt 5g, 5th story, 1st apartment from south at west
Aug 16, 2012 · Apt 5G
Closed — Violation closed
DOB building violations · 100
- Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2022
Apr 22, 2023
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 9, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 9, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 9, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 9, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 9, 2020
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 27, 2019
Dob violation - active - Plumbing none
The dob intends to revoke all approvals and permits under plumbing laa #121645032 due to suspension of master plumbers license. stop all plumbing work under above mentioned permit and obtain a new master plumber to supersede the plumbing permit
Aug 7, 2018
Dob violation - dismissed
Show 40 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Mar 12, 2018
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 10, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 10, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 10, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 10, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 10, 2017
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 1, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 1, 2016
Vw-violation work without permit - active - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 1, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 1, 2016
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 4, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 4, 2015
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2015
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 4, 2015
Vw-violation work without permit - active - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 4, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 4, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 4, 2015
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 6, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 15, 2014
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 3, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 12, 2013
Vw-violation work without permit - active - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 12, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 12, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 12, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 12, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 12, 2012
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 12, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 12, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 12, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 12, 2012
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2012
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jan 1, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 15, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 15, 2011
Dob violation - resolved
ECB violations · 56
- Class - 2
At time of inspecton i observed sidewalk shed installed on exposure # 1 without signs or project information panel on the shed parapet, to display the name and the contact information of the owner or the gener
Jul 17, 2024 · Penalty $1,250
Resolve - Class - 2
Found weil mclain boiler model #1488, in operable, safety relief valve undersized and missing test lever and body drain, handles missing on glass gauge assembly. found open duct work in boiler room need to be c
Jan 3, 2022 · Penalty $1,563
Resolve - Class - 2
Found corroded water column, glass gauge defective missing handles, safety relief valve undersized and missing test lever and body drain.
Jan 3, 2022 · Penalty $1,563
Resolve - Class - 2
Found ao smith. hw-660 boiler not registered with dob and not operable.
Jan 3, 2022 · Penalty $625
Resolve - Class - 2
Found exposed wires, spill switch on draft hood not properly installed, common draft inducer for blrs 3,4,5,6, not operable, temp unit installed not of proper size.
Jan 3, 2022 · Penalty $1,563
Resolve - Class - 2
Found exposed wires, spill switch noy properly installed
Jan 3, 2022 · Penalty $625
Resolve - Class - 2
Weilmclain 1488 boiler #1 failure to maintain
Sep 29, 2021 · Penalty $1,562
Resolve - Class - 2
Weilmclain 1488 boiler # 2 failure to maintain
Sep 29, 2021 · Penalty $1,562
Resolve - Class - 2
Ao smith hw 1240 failure to maintain boiler's mechanical exhaust inoperative
Sep 29, 2021 · Penalty $1,562
Resolve - Class - 1
1rcny 103-04 failure to repair swarmp conditions in a timely manner. owner failed to repair "cracks and loose concrete patches in concrete eyebrows" at exp.4(south) within the time frame recommended by qewi. pa
Apr 16, 2021 · Penalty $2,500
Resolve
Show 40 more ↓
- Class - 2
97r5 illegal removal of elevator device 1f9046.file application per removal and file test with the nyc dob.
Apr 6, 2020 · Penalty $6,250
Active - Class - 2
99bb5,68b7(99-bb-7)cat 1 tag expired perform and file test 68-b-7 maintenance log not up to date.
Apr 6, 2020 · Penalty $1,562
Resolve - Class - 1
42m5 no door lock monitoring installed in this controller as per 3.10.12 of appendix k3 of the 2014 nyc bc.this is a controller feature which ensures passenger safety remedy's file application,install dlm and p
Apr 6, 2020 · Penalty $3,125
Resolve - Class - 1
42m5 no door lock monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the nyc bc this is a controller feature which ensures passenger safety remedy:file application,install dlm and
Apr 6, 2020 · Penalty $1,250
Resolve - Class - 2
Relief valve needed on exspansion tank. controls jumped out. exsposed wires. low water cut off missing/ not operating.
Mar 4, 2020 · Penalty $312
Resolve - Class - 2
Work w/o permit. noted: at time of inspection in apt#21a renovation work to the bathroom observed. removal water/waste line from bathtub to create a shower. approx 50% of work completed. remedy: obtain all perm
Mar 19, 2019 · Penalty $625
Resolve - Class - 2
Work without a permit. at time of inspection observed partial demolition of commercial space and erection of sheetrock and metal stud walls no permits were in place and site was littered with const.
Feb 14, 2019 · Penalty $625
Resolve - Class - 2
97x10 restore to service for proper inspection by dob.
Jan 10, 2018 · Penalty $500
Resolve - Class - 2
Sec. 37-751 misc violation of condition on as of right privately owned oublic space. noted: at time of inspection plaque/sign indicating public plaza located at the corner of white st & broway does not meet req
Oct 26, 2017
Resolve - Class - 3
Occupancy contrary to that allowed by c of o#113288. noted: c of o lists cellar & 1st sty as retail sales zoning group use #10. at time of motorcycle sales zoning group use #9. remedy: disc illegal use &/or amm
Feb 16, 2017 · Penalty $400
Resolve - Class - 2
01x10,56y02,56y10,59u07. 02x-restore phone line in elevator to workingstatus. 56-clean and seal oil leak on machine in m.r.; 59u-perform brake maintenance and provide a date in maintenance log and a tag on cont
May 9, 2016
Resolve - Class - 2
Sec. 27-42 misc. violations of the zoning resolution. noted: failure to provide required plaques w/signage required for residential plazas. no required plaques/signage present. remedy: conform w/zoning resoluti
Oct 20, 2015 · Penalty $4,000
Resolve - Class - 2
Sec. 74-761 & 37-622 misc violations of the zoning resolution. noted: reduction of or elimination of size of residential plaza for commercial use w/o permission of dept of city planning. approx 7 motorcycles on
Oct 20, 2015 · Penalty $4,000
Resolve - Class - 2
Sec. 27-41 misc. violations of the zoning resolution. noted: failure to maintain required vegetation at residential plaza. the hexagonal planter at plaza entrance at broadway & white street has no vegatation &
Oct 20, 2015 · Penalty $4,000
Resolve - Class - 2
Permanent dwelling used/converted for other than permanent residentialpurposes:certificate of occupancy #113288 indicates 24 +(ph)building to be ilegally approved as multiple dwelling class "a" apt. building. a
Aug 3, 2015 · Penalty $1,630
Resolve - Class - 1
Failure to maintain building in code-compliant manner:lack of a systemof automatic sprinklers where required per bc 903.2; 27-954 for trans iently occupied apt #2g. rmdy: discontinue illegal occupancy.
Aug 3, 2015 · Penalty $1,000
Resolve - Class - 1
Bc907.2.8 failure to provide class"t" fire alarm system for transiently occupeid apt 2g. rmdy: discontinue illegal occupancy.
Aug 3, 2015 · Penalty $1,600
Resolve - Class - 1
3310.8.3,failure to maintain site safety log book.noted:@ time of inspno site safety daily insp log on site.active rigging work.rem:comply w/ code.
Jun 16, 2014
Resolve - Class - 2
Partial swo issued for suspended scaffold pursuant 28-207.2 & posted on premises.failed to notify dept prior to use/inst.off c hooks in connection w/ suspended scaffold.noted:@ time of insp c-hooks in connectio
Jun 16, 2014 · Penalty $400
Resolve - Class - 2
Partial swo issued for suspended scaffold pursuant 28-207.2 & posted on premises.failed to notify dept prior to use/insa.off outrigger beamsin connection w/ suspended scaffold noted:@ time of insp outrigger bea
Jun 16, 2014 · Penalty $400
Resolve - Class - 2
Partial swo issued for outrigger beams pursuant 28-207.2 & posted on premises.work does not conform to approved const documents.noted:@ timeof insp tieback for outrigger beams connected to the cable that suppor
Jun 16, 2014 · Penalty $250
Resolve - Class - 1
3310.6,failure to designate site safety manager/site safety coorndinator.noted:@ rime of insp no records of site safety manager being on site from 06/01/14-06/16/14.ssu name not in attendance book that is kept
Jun 16, 2014 · Penalty $1,600
Resolve - Class - 2
Failure to comply w/ comm's order to file a cert of correction w/ deptof bldg.for noc #35013951x.noted:no cert of correction was filed w/ dept of bldg by respndent for cited nov pursuant to 28-204.2.rem:file ce
May 13, 2014 · Penalty $830
Resolve - Class - 2
Sidewalk shed does not meet code specifications.noted: at time of inspection (9:15pm) sidewalk shed erected at exposures #1, 2, and 3 has multiple inoperative light fixtures. rmdy: conform shed to code specific
Dec 2, 2013 · Penalty $2,400
Resolve - Class - 1
Work does not conform to approved construction doc/plan. at time of inspection observed sidewalk shed erected on expo 1 2 & 3 does not conform to approved site safety plan. suspended scaffolds in place. section
Nov 25, 2013 · Penalty $1,000
Resolve - Class - 1
Work w/o a permit.noted:job#121642730 for modification to existing store front was disapproved 8/26/13 and at time of inspection observed sections of brick and glass of store front removed and plywood erected
Sep 17, 2013 · Penalty $8,000
Resolve - Class - 2
02b10,56y13.(02b10)repair alarm bell.(56y13)seal oil leak or hoist machine drive sheave bearing.
Jul 22, 2010
Resolve - Class - 2
Work w/o a permit. horizontal extension has been created on the 25th fl ph 3 made of glass approx 39'x 10' in floor area & 8' high. remedy: obtain permit or restore to prior legal condition.
Jan 6, 2009
Resolve - Non-hazardous
Failure to provide access for people w/physical disabilities as required.entrance door on white street nw corner can't be used by people w/physical disabilities.entrance from sidewalk has one step up.remedy:
Jun 24, 2008 · Penalty $2,500
Resolve - Non-hazardous
83x10.15m11.11t11 83x10 entire device found inoperative below 12 inches from ground level repair device & restore device back to service 11 i 11 replace busted car station button
Jun 3, 2008
Resolve - Hazardous
08v01.64q03.71m07.41d06.43o02.63u15.84m07.38m07.17h10.27i10.28q03.71q03. 71m07 light 71q03 light 41d06 relay 63u15 hoist motor 84m07 fire extinguisher 38m07 electric eye box cover f27i10 mo rollers
May 13, 2008
Resolve - Non-hazardous
86m05.63d06.63m07.55o02.84x10.75h14.86m05 missing 2yr test tag missingperform & file test 63d06 id tag found not secure to main machine properly secure tag 63m07 missing id on main machine disconnect switch pro
Apr 18, 2008 · Penalty $500
Resolve - Non-hazardous
55y10.63d06.86bb05.60u15.55o02.88v01.64x10.84x10.73h14. 55y10 oil leakrepair main machine 63d06 properrly secure id tags on main machine 36bb05 2yr test tag expired perform & file test 60v15 missing id tag on
Apr 18, 2008 · Penalty $180
Resolve - Non-hazardous
63m07.55y10.86bb05.84x10.73h14.63m07 missing id tags main machine provide tags 55y10 repair oil leak 86bbo5 2yr tag expired perform & file test 84x10 communication not working properly repair communication syst
Apr 18, 2008 · Penalty $180
Resolve - Hazardous
86m05.63d06.63m07.66o02. 86m05 missing 2yr test tag perfom & file test63d06 i.d tag not secure on main machine properly secure id tag 63m07 missing id tag on machine disconnect switch provid eid tag 66002 prop
Feb 27, 2008 · Penalty $180
Resolve - Hazardous
63m07.55y10.39o02.55o02.39o02.84b01.84l10.33o02.84l11. 63m07 provide city id tag on machine disconnect 55y10 seal oil leak by repair 39002 clean up oil leak on fl 84301 adjust car door open slow down doors sla
Feb 27, 2008
Resolve - Hazardous
38o02.63m07.55y10.55o02.08v01.64x10. 38o02 properly clean car top 63m07 provide id tag on main line disconnect switch 08v01 properly adjust fl leveling
Feb 27, 2008
Resolve - Non-hazardous
Failure to safeguard public in that sidewalk shed was installed w/a 12foot high section of parapet that is loaded in excess of its design capacity creating a haz condition. remedy:restore parapet to a 4'height
Dec 11, 2006 · Penalty $2,500
Resolve - Hazardous
Using rigging equipement w/o a special rigger lic
Sep 1, 2006 · Penalty $500
Resolve - Non-hazardous
Having installed an advertising sign on a sidewalk shed without permits for sign (see photo). noted: location broadway and white st. m1-5 district. advertising sign appox. 70'in length and 8'in height (see
Mar 24, 2006 · Penalty $800
Resolve
Complaints
- Plumbing
Basin/sink
Sep 6, 2026 · Apt 4F
Open - Heat/hot water
Entire building
Feb 10, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 10, 2026 · Apt 13A
Close - Heat/hot water
Entire building
Feb 10, 2026 · Apt 13A
Close - Heat/hot water
Entire building
Feb 10, 2026 · Apt BLDG
Close - Water leak
Heavy flow
Feb 10, 2026 · Apt 15B
Close - Water leak
Heavy flow
Feb 10, 2026 · Apt 15B
Close - Water leak
Heavy flow
Feb 10, 2026 · Apt 10B
Close - Heat/hot water
Entire building
Oct 15, 2025 · Apt 3D
Close - Heat/hot water
Entire building
Jan 7, 2025 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
May 17, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 26, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 26, 2024 · Apt 4B
Close - Heat/hot water
Entire building
Apr 26, 2024 · Apt APT3G
Close - Heat/hot water
Entire building
Jan 25, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 3, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 3, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 2, 2024 · Apt BLDG
Close - Plumbing
Water supply
Dec 18, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 17, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 17, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 17, 2023 · Apt 3G
Close - Heat/hot water
Entire building
Dec 16, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 30, 2023 · Apt BLDG
Close - Water leak
Damp spot
May 14, 2023 · Apt 23F
Close - Flooring/stairs
Floor
May 14, 2023 · Apt 23F
Close - Plumbing
Basin/sink
May 14, 2023 · Apt 23F
Close - Heat/hot water
Apartment only
May 14, 2023 · Apt 23F
Close - Unsanitary condition
Sewage
May 11, 2023 · Apt 23F
Close - Unsanitary condition
Sewage
May 11, 2023 · Apt 23F
Close - Heat/hot water
Apartment only
May 11, 2023 · Apt 23F
Close - Plumbing
Basin/sink
May 11, 2023 · Apt 23F
Close - Heat/hot water
Entire building
Feb 4, 2023 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 4, 2023 · Apt 24C
Close - Heat/hot water
Apartment only
Feb 2, 2023 · Apt 23F
Close - Heat/hot water
Apartment only
Jan 30, 2023 · Apt 23F
Close - Heat/hot water
Apartment only
Dec 30, 2022 · Apt 23F
Close - Heat/hot water
Entire building
Dec 15, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 15, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 15, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 14, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 28, 2022 · Apt BLDG
Close - Water leak
Slow leak
Sep 23, 2021 · Apt PH3
Close - Unsanitary condition
Mold
Sep 23, 2021 · Apt PH3
Close - Flooring/stairs
Floor
Sep 23, 2021 · Apt PH3
Close - Water leak
Heavy flow
Sep 23, 2021 · Apt PH3
Close - Unsanitary condition
Mold
Jul 6, 2021 · Apt 6F
Close - Appliance
Electric/gas range
Dec 1, 2020 · Apt 22B
Close - Appliance
Electric/gas range
Nov 11, 2020 · Apt 22B
Close - Water leak
Slow leak
Nov 11, 2020 · Apt 22B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (RM)
- Year built
- 1990
- Floors
- 24
- Residential units
- 163
- Building area
- 117,020 ft²
- Lot area
- 11,288 ft²
- Zoning
- C6-4A
- Community board
- 101
- Council district
- 1
- Block / lot
- 172 / 7501
- Assessed value
- $16,682,860
- Landmark / historic district
- Tribeca East Historic District
HPD registration #140780, last renewed Sep 23, 2025.
Questions about 374 Broadway
Who owns 374 Broadway?
The owner of record in NYC Department of City Planning PLUTO data is Mandarin Plaza.
Does 374 Broadway have violations?
Yes. NYC HPD has recorded 22 housing violations at this property.
Is 374 Broadway rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 374 Broadway built?
City records list 1990 as the year it was built.
How many apartments are in 374 Broadway?
It has 163 residential units and 164 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.