18 Bowery
Manhattan, NY 10013BBL 1-00162-0053Map
Owner of record: Mooney House LLC
18 Bowery is an office building built in 1789 in Manhattan, 10013. It has 5 residential units across 4 floors. The owner of record is Mooney House LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 37
- ECB violations
- 35
- HPD complaints
- 1
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 37
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 11, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 4, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Construction other optional
Exp4 crn-bulg brck.wall ties 2fl missig,bld inter unfinshcntr guirder centr & post cellar missng.exp1 roof guirder dmgd atticjoist dmgd retain nyspe & reg gc-eval, file & permit all repairs under superv of pe
Mar 28, 2022
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 24, 2021
Dob violation - active
Show 27 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 13, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 18, 2021
Dob violation - active - Construction other optional
Emerg work:at exp1/4 crnr where prior store frnt remvd&infilled w/cmu+ brck,1 stry tall vert crck@1flr btwn face brck@exp1+4.at exp4 bulge in brck wall spanned frm grde-3fl.2 existng wall ties@2fl lvl not attchd- fl frmg.ownr immd retn nys lic pe&dob contr-eval crck/bulg extr walls+ immd instl,suprt tie backs.wrk-supv.field rpts.file app emerg wrk 2day
Jul 28, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 21, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 28, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 3, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 6, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 11, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 5, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 17, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 7, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 26, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 17, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 6, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 6, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 6, 2019
Dob violation - dismissed - Landmark none
Landmk-landmark none
Dec 7, 2018
Dob violation - active - Landmark none
Landmk-landmark none
Dec 7, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Landmark none
Landmk-landmark none
Jun 30, 2017
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed
ECB violations · 35
- Class - 1
Failure to maintain building in code compliant manner; at time of inspection, i observed angle irons improperly installed at exposure 4 facade. angle iron screwed to facade improperly at window sill., repair an
Sep 29, 2025 · Penalty $5,000
Active - Class - 1
Failure to maintain at time of inspection angle iron not screwed to facade properly ,angle is resting on window sill. also metal plate on exp#4 on the ground has holes and very dangerous to the public., repair
Jun 4, 2025 · Penalty $2,500
Resolve - Class - 2
Failure to file required annual boiler inspection reports for low-pressure boiler 10000078403n0001 in accordance with the rules of the department. 1rcny 103-01(d)(1) requires that an annual inspection report fo
Dec 16, 2024 · Penalty $3,125
Active - Class - 2
At time of inspection i observed sidewalk shed installed on exposure #1 and 4 m00500693-i1-sh with expires: permit 09/05/2023..
Jun 17, 2024 · Penalty $1,250
Active - Class - 2
3307.6.3-at time of inspection observed sidewalk shed erected at exposure# 1-4 the vertical membrane at exposure# 4. was not the 18 inches as required from the curb line ..
Jun 17, 2024
Resolve - Class - 2
At time of inspection observed pipe scaffold installed on exposure # 1 and 4-m00500811-i1-sf- with expires permit 09/05/2023stop all use of pipe scaffold at expo#1-4
Jun 17, 2024 · Penalty $1,250
Active - Class - 2
At time of inspection observed sidewalk shed installed on exposure # 1 and 4 project information panel/sidewalk shed parapet panel/construction sign not provided or not in compliance with section ..
Jun 17, 2024 · Penalty $1,250
Active - Class - 2
At time of inspection observed sidewalk shed erected alexpos 1 and 4 observe damage mudsills create an unsafe condition for pedestrian ..
Jun 17, 2024 · Penalty $2,400
Resolve - Class - 2
Chimney blocked with debri. manual reset low-water cutt off missing.
Aug 28, 2023 · Penalty $625
Active - Class - 1
Time of inspection i observed sidewalk shed installed on exposure #1 and 4 with inoperable light bulbs at underside the shed to bring illumination failure to provide lighting creates unsafe and mugging conditio
Aug 7, 2023 · Penalty $1,250
Active
Show 25 more ↓
- Class - 1
At time of inspection i observed sidewalk shed installed on exposure #1 and 4 with inoperable light bulbs underside the shed to bring illumination failure to provide lighting creates unsafe and mugging condit
May 9, 2023 · Penalty $12,500
Active - Class - 2
At time of inspection i observed sidewalk shed installed on exposure # 1 and 4 without sign or project information panel on parapet to indicate the name and contact information of the owner or general contracto
May 9, 2023 · Penalty $6,250
Active - Class - 1
Failure to maintain bldg w/code compliant manner.at time of inspectionnoted:facade all exposures numerous locations of bulging brick,loose &/or missing masonry throughout facade.no overhead protection for publi
Aug 26, 2021 · Penalty $3,125
Active - Class - 1
Failure to maintain bldg in codecompliant manner.atoi noted:@all exps facade has numerous locations w/bulging brick,cracked &/or missing brick.no overhead protection in place to protect public.comply w/code
Jul 13, 2021 · Penalty $6,250
Active - Class - 1
Failure to maintain building in code compliant manner.at time of inspection noted vertical and horizontal structural cracks,missing mortar throughout all facade at all exposures.also damaged and/or missing mort
May 25, 2021 · Penalty $12,500
Active - Class - 1
Failure to maintain building in code compliant manner.note:at exposure #1 front entrance door in state of disrepair where as the ornate moulding around door is rotten and falling apart.also at roof level cornic
Apr 21, 2021 · Penalty $12,500
Active - Class - 2
Failure to maintain bldg in code compliant manner at time of inspection. noted: exp#1 entrance door in disrepair w/rotted wood & exp#4 facade multiple areas of cracked masonry. remedy: comply with code.
Apr 14, 2021 · Penalty $3,125
Resolve - Class - 1
Failure to maintain building in code compliant manner.noted:at time ofmy inspection,i observed at exposure#1 front entrance door is rotten and broken also at exposure#4 the corner on the north side vertical cra
Jan 28, 2021 · Penalty $12,500
Active - Class - 1
Failure to maintain bldg in code compliant manner. noted: at exp#1 entrance door is rotten,broken & detached. north corner vertical crack developed from street level to approx 7' above. window seal & frame in
Dec 10, 2020 · Penalty $12,500
Active - Class - 1
Failure to maintain bldg in code compliant. noted: at exp#1 entrance door frame rotten,broken & detaches. windows frames & seal indisrepair.north corner vertical corner crack from street level to approx 7' up.
Oct 8, 2020 · Penalty $6,250
Resolve - Class - 1
Failure to maintain bldg in code compliant manner. noted: at time of inspection i observed at exp#1 front entrance the door frsame damaged &pulling away also missing masonry at the facade at all exposure,window
Aug 21, 2020 · Penalty $6,250
Resolve - Class - 1
Failure to maintain building in code compliant manner noted at time of inspection i observed at exposure #1 front entrance the door frame damaged and pulling away also missing masonry at the facade at all expos
Feb 6, 2020 · Penalty $6,250
Resolve - Class - 1
Failure to maintain bldg in code compliant manner. at time of inspection noted damaged,defective &/or missing masonry at all facade exposures masonry window sills over entrance to bldg is damaged & creates pote
Dec 21, 2019 · Penalty $6,250
Resolve - Class - 1
Failure to maintain buidling in code compliant manner noted dmaaged missing brick masonry throughout facade all exposures all floors repair replace
Nov 15, 2019 · Penalty $6,250
Resolve - Class - 1
Failure to maintain bld.walls or appurtenances in code compliant manner.at time of inspection,noted defective,cracked/missing,damaged masonry thru-out facade @exp#1,#4,all levels with bulging walls @facade,exp#
Jul 24, 2019 · Penalty $12,500
Resolve - Class - 1
Failure to comply with the commissioners order contained in summons/violation #35342913m issued on 12/05/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.work without permit.rem:
Jun 8, 2019 · Penalty $12,500
Resolve - Class - 1
Failure to maintain building walls or appurtenances.at time of inspection noted at exposure # 1 front step exposed damaged brick masonry. also at exp #14 damage masonry window sills missing masonry elements.
May 18, 2019 · Penalty $12,500
Resolve - Class - 1
Failure to comply w/the comm's order contained in summons/vio#35342913m issued on 12/05/18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. work w/o permit. note full renovation on interior.
Mar 28, 2019 · Penalty $12,500
Resolve - Class - 1
Failure to maintain bldg walls or appurtenances at time of inspection.noted: at exp#1 front step exposed damaged brick/masonry also at exp#4masonry sills damaged/missing masonry elements. remedy: maintain bldg
Mar 23, 2019 · Penalty $2,500
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35342914y issued on 12-05-18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. for working against a swo. remedy: comply w/comm's order &/or
Jan 28, 2019 · Penalty $3,125
Resolve - Class - 1
Failure to maintain bldg walls appurtenances. noted: at time of inspection, i observed at exp#1 front entrance door cracked & in disre¢air also masonry lintel window sills is in disrepair at exp#4 the entire fa
Jan 14, 2019 · Penalty $6,250
Resolve - Class - 1
Unlawfully continued work while on notice of a stop work order. at time of inspection observed work in progress while on notice of a stop work order issued 5/23/18. rem: comply with stop work order.
Dec 5, 2018 · Penalty $5,000
Resolve - Class - 1
Work without permit. at time of inspection, observed construction work, painting, plastering framing, drywall, electrical and plumbing work in progress on 1st, 2nd and 3rd floor of building. approximately 45% o
Dec 5, 2018 · Penalty $2,500
Resolve - Class - 1
Failure to maintain building wall(s) or appurtenances noted, premises 4story attached nfp masonry brick building, at the time of inspection,i observed cracked disrepair entrance door masonry lintel window sills
Nov 20, 2018 · Penalty $2,500
Resolve - Class - 2
Work w/o a permit. work noted: at time of inspection observed construction work in progress on 2nd sty,the installation of metal & wood studs on walls & ceiling approx 50% work completed. remedy: stop work obta
May 23, 2018 · Penalty $1,280
Resolve
Complaints
- Heat/hot water
Entire building
Nov 27, 2017 · Apt 16
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Office building (O8)
- Year built
- 1789
- Floors
- 4
- Residential units
- 5
- Building area
- 8,142 ft²
- Lot area
- 2,500 ft²
- Zoning
- C6-1
- Community board
- 103
- Council district
- 1
- Block / lot
- 162 / 53
- Assessed value
- $770,850
- Landmark / historic district
- INDIVIDUAL LANDMARK
Questions about 18 Bowery
Who owns 18 Bowery?
The owner of record in NYC Department of City Planning PLUTO data is Mooney House LLC.
Does 18 Bowery have violations?
NYC HPD has no housing violations on record for this property.
Is 18 Bowery rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 18 Bowery built?
City records list 1789 as the year it was built.
How many apartments are in 18 Bowery?
It has 5 residential units and 7 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.