46 Warren Street
Manhattan, NY 10007BBL 1-00136-0007Map
Owner of record: 46 Warren, LLC
46 Warren Street is a mixed residential and retail building built in 1855 in Manhattan, 10007. It has 4 residential units across 5 floors. The owner of record is 46 Warren, LLC. HPD has recorded 9 housing violations here, most recently on October 29, 2021. 1 of the 9 most recent violations are still open.
- HPD violations
- 9
- DOB violations
- 22
- ECB violations
- 6
- HPD complaints
- 2
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 9
- CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 2, 2nd story, 1st apartment from south at west
Oct 29, 2021 · Apt 2
Closed — Violation closed - CImmediately hazardous
Code: arrange and make self-closing the doors in the entrance located at apt 2, 2nd story, 1st apartment from south at west
Oct 29, 2021 · Apt 2
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Oct 29, 2021
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story
Oct 29, 2021
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Oct 29, 2021
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story
Oct 29, 2021
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Oct 29, 2021
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Oct 29, 2021
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at public hall, 1st story and at boiler room
Oct 29, 2021
Closed — Violation dismissed
DOB building violations · 22
- Construction other optional
Failure to maintain building in code compliant manner. observed crack stucco on 1 floor around mail box area at building entrance. remedy: repair and/or replace
Jan 12, 2026
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Construction other optional
.failure to maintain building in a code compliant manner. at facade#1 areas of spallin/cracks on all levels of the building exposure.remedy: repair/replace
Apr 4, 2024
Dob violation - active - Construction other optional
Failure to maintain building in a code compliant manner.at time of inspection observe at facade#1areas of spalling/cracks on all levels of the building.remedy:maintain exterior facade make necessary repairs
Dec 12, 2023
Dob violation - active - Construction other optional
Failure to maintain building in code compliant manner defective facade at exposure#1 south elevation.damaged stucco at window lintel.defected window frames,corrosion of fire escape,spalling and crack at 1st floor near entrance.remedy:maintain building.repair and/or replace
Aug 31, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Construction other optional
Failure to maintain building in code compliant manner:view defected facade at exposure#1 south elevation:damaged stucco at window lintel defected window frames,corrosions of fire escape,spalling and crack at 1 floor near building entrance. remery:maintain building,repair and or replace
Jun 29, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active
Show 12 more ↓
- Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Construction other optional
Failure to maintain building in core compliant manner as noted:at time of inspection observed on exposure#1 south elevation:deteriorating mas masonry around windows on 2nd floor and at parpet waall south east end remedy:repair facade in code compliant manner
Feb 7, 2023
Dob violation - active - Construction other optional
Emergency work order due to deteriorating facade conditions. cracks and spalled masonry, exp1 in several locations. conditions include deteriorating wood window frames, rusted fire escapes, spalled masonry throughout facade. remedy: immed provide sidewalk shed to protect public from overhead hazard
Aug 24, 2022
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 4, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 9, 2020
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - active - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Construction other optional
C-construction other optional
Aug 31, 1989
Vp-violation unserved ecb-active - Construction other optional
C-construction other optional
Aug 31, 1989
Dob violation - dismissed - Elevator elevatorrequired
(51)restore elevator service so this department can make a complete inspection
Apr 18, 1989
Dob violation - resolved
ECB violations · 6
- Class - 2
At time of inspection observed: sh installed at expo# 1.pedestrian protection does not meet code specifications bc3307.1. rusted ci sheets under deck falling on sidewalk, missing deck plank & sheets. created po
Aug 3, 2026 · Penalty $2,400
Resolve - Class - 2
Pedestrian protection does not meet code specification. note: observedsidewalk shed is in place @ front of the bldg. sidewalk shed lights are not operating @ time of insp 2:30am that does not meet code specific
Jul 30, 2016 · Penalty $2,400
Resolve - Non-hazardous
Work does not conform to approved plan permit #104665033-01 additional rooms & door opening were created at basement level and stair way to cellar removed.stop all work! remedy:conform to approved plans or amen
Apr 10, 2007
Resolve - Non-hazardous
Occupancy contrary to that allowed by the c of o #97509. 2nd to 5th flare class a apts. 2nd fl being used for art performances. approx 5 persons at premises. remedy: discontinue illegal use.
Nov 14, 1997
Resolve - Non-hazardous
Occupancy contrary to that allowed by the certificate of occupancy 97509 second to 5th floor are class a apartments. 2nd floor being used for art. performances. approx. 5 persons at premises. remedy: discontinu
Nov 14, 1997
Resolve - Non-hazardous
At 4th floor occupancy contrary to that allowed by certificate of occupancy #097509. from: class "a" apartment to a presign office & warehouseing or storing sevealers with at least (7) seven enjoyre & knitting
Nov 8, 1996 · Penalty $800
Resolve
Complaints
- Heat/hot water
Apartment only
Oct 29, 2021 · Apt 2
Close - General
Cooking gas
Oct 29, 2021 · Apt 2
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S4)
- Year built
- 1855
- Floors
- 5
- Residential units
- 4
- Building area
- 10,522 ft²
- Lot area
- 2,506 ft²
- Zoning
- C6-3A
- Community board
- 101
- Council district
- 1
- Block / lot
- 136 / 7
- Assessed value
- $2,606,850
- Landmark / historic district
- Tribeca South Historic District Extension
HPD registration #140853, last renewed Jul 21, 2025.
Questions about 46 Warren Street
Who owns 46 Warren Street?
The owner of record in NYC Department of City Planning PLUTO data is 46 Warren, LLC.
Does 46 Warren Street have violations?
Yes. NYC HPD has recorded 9 housing violations at this property.
Is 46 Warren Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 46 Warren Street built?
City records list 1855 as the year it was built.
How many apartments are in 46 Warren Street?
It has 4 residential units and 5 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.