59 Maiden Lane
Manhattan, NY 10038BBL 1-00067-0001Map
Owner of record: 59 Maiden Lane Assoc LLC
59 Maiden Lane is an office building built in 1965 in Manhattan, 10038. The owner of record is 59 Maiden Lane Assoc LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 272
- ECB violations
- 134
- HPD complaints
- 282
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 272
- Construction other optional
Failure to maintain bldg in code compliant manner. time of inspection exp 1 s elev,exp#1 cracks in brick work on mult flrs;spalled brick @ water cooler,brick exp 2 e missing section of brick on several floors exp3 n, missing section on brick on several flors spalling masonry crack/damaged concrete beams & colmn.remedy repair and/or replace
Sep 5, 2024
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2023
Dob violation - dismissed - Construction other optional
Failure to maintain building in a code compliant manner.observed open masonry on exposures 3&4 in multiple locations.remedy:fix and or replace
Aug 31, 2023
Dob violation - active - Construction other optional
Failure to maintain building in code compliant manner.observed open masonry and cracks at exposure #3 and open masonry at exposure#4 remedy:repair and/or replace
May 1, 2023
Dob violation - active - Construction other optional
Failure to maintainexterior of building facade and appurtenances.note: previous conditions observed on 11-22-2023 remains.observed cracked masonry at multiple locations at expsure's 1,2&4.spalled stone at multiple locations at exposure3&4.missing masonry at expsure's#4&3 at multiple locations remedy take safety measures&repair damaged facade
Feb 7, 2023
Dob violation - active - Construction other optional
Ftm bldg in a code compliant manner. prvious conditions remain observed spalling and missing masonry on several floors on exp3 north elevation and damaged mortar joints on exp4 north elev as well remedy: comply with code
Nov 22, 2022
Dob violation - active - Construction other optional
Failure to maintain exterior building walls and appurtenances.observ on exp3 north elevation and exp4 east elevation: spalling and missing masonry on several floors these conditions appear to be hazardous and need immed attension/repair. remedy: maintain bldg walls. provide adequate safety measures, repair damaged facade as per 1rcny 103-04
Jun 28, 2022
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 22, 2021
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 17, 2021
Dob violation - dismissed - Hazardous condition (facade) facade required
Cycle 9b unsafe report filed
Oct 30, 2020
Dob violation - active
Show 40 more ↓
- Hazardous condition (facade) facade required
Cycle 8b unsafe report filed
Oct 30, 2020
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Sprinkler none
Failed to file final sprinkler report by july 1, 2019
Sep 3, 2019
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 20, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 20, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 20, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 20, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 15, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 15, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 15, 2019
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 11, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 11, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 11, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 11, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 11, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 11, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 11, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 11, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 11, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 11, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 11, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 10, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 10, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 10, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 10, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 10, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 10, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 10, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 10, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 10, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 10, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 10, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 10, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 9, 2016
Dob violation - resolved
ECB violations · 134
- Class - 2
Equipment user new roc failed to maintain complete/accurate required documents/logs for the mast climbers on site. pre-shift insp. documents contained incorrect serial #'s that did not correspond with cn#10825,
Sep 21, 2026 · Penalty $1,250
Active - Class - 2
Equipment user new roc failed to maintain complete/accurate required documents/logs for the mast climbers on site. pre-shift insp. documents contained incorrect serial #'s that did not correspond with cn#10925,
Sep 21, 2026 · Penalty $1,250
Active - Class - 2
Equipment user new roc failed to maintain complete/accurate required documents/logs for the mast climbers on site. pre-shift insp. documents contained incorrect serial #'s that did not correspond with cn#11125,
Sep 21, 2026 · Penalty $1,250
Active - Class - 2
Equipment user new roc failed to maintain complete/accurate required documents/logs for the mast climbers on site. pre-shift insp. documents contained incorrect serial #'s that did not correspond with cn#11225,
Sep 21, 2026 · Penalty $1,250
Active - Class - 2
Equipment user new roc failed to maintain complete/accurate required documents/logs for the mast climbers on site. pre-shift insp. documents contained incorrect serial #'s that did not correspond with cn#11325,
Sep 21, 2026 · Penalty $1,250
Active - Class - 2
Equipment user new roc failed to maintain complete/accurate required documents/logs for the mast climbers on site. pre-shift insp. documents contained incorrect serial #'s that did not correspond with cn#11425,
Sep 21, 2026 · Penalty $1,250
Active - Class - 2
Equipment user new roc failed to maintain complete/accurate required documents/logs for the mast climbers on site. pre-shift insp. documents contained incorrect serial #'s that did not correspond with cn#11525,
Sep 21, 2026 · Penalty $1,250
Active - Class - 1
Equipment user new roc failed to maintain complete/accurate mast climber documents/logs. preshift insp. records for cn#11625, cd#5908, pos. 8 contained incorrect serial #s. required logs, incl. user info, prein
Sep 21, 2026 · Penalty $2,500
Active - Class - 1
Equipment user new roc failed to maintain complete/accurate mast climber documents/logs. preshift insp. records for cn117/25, cd5824 pos. 9 contained incorrect serial #s. required logs, incl. user info, preinst
Sep 21, 2026 · Penalty $2,500
Active - Class - 1
In response to an incident where pieces of bricks fell from 48 floor exterior during facade demolition operation and fell on worker below on suspended scaffold on 31 floor and also fell on adjacent building cou
Jun 29, 2026 · Penalty $10,000
Resolve
Show 40 more ↓
- Class - 1
A pieces of bricks fell from 48 floor exterior during facade demolition operation and fell on worker below on suspended scaffold on 31 floor inspection reveal workers was working above each other at the same ex
Jun 29, 2026 · Penalty $5,000
Resolve - Class - 2
3314.1-active facade work w/ supported scaffold on the 44thb fl roof/bulkhead. review of approved plans on site, supported scaffold installation does not conform. w/ makeshift pipe clamp connections to suspende
Oct 17, 2025 · Penalty $625
Resolve - Class - 2
3301.4 inspection- observed daily inspections for both supported scaffolding & suspended scaffolding, stating that both systems are adequate w/out unsafe violating conditions. stop all use of suspended scaffold
Oct 17, 2025
Resolve - Class - 2
Suspended scaffolding installed @ roof/ bulk head area of jobsite. make shift connections attaching outriggers and frames to supported scaffold and all other suspended scaffold riggs throughout entire roof, not
Oct 17, 2025
Resolve - Class - 1
Noted: multiple violating conditions observed, including misuse/handling of electric power source and power tools (missing guards, daisy-chaining, splicing, not connected to a gfci) missing guardrails, missing
Feb 13, 2025 · Penalty $5,000
Resolve - Class - 2
I observed pedestrian protection (sidewalk shed) installed at expos 3&4 contrary to code. multiple locations with pipe across pathway set below the 8ft height min contrary to code 3307.6.4.7 multiple vertical
Feb 5, 2025 · Penalty $2,400
Resolve - Class - 2
I observed pedestrian protection (sidewalk shed) installed at expos 1&4 contrary to code. multiple locations under shed with a horizontal pipe set below the required 8ft minimum height across pathway contrary t
Feb 5, 2025 · Penalty $2,400
Resolve - Class - 2
Upon inspection of an active 44 story facade alt construction site i observed a sidewalk shed installed at expos 1 and 4 contrary to chapter 33 color specs. i observed all sidewalk shed metallic members (vertic
Feb 5, 2025 · Penalty $1,280
Resolve - Class - 2
I observed sidewalk shed parapet panel at exposure 1 3 & 4 with unlawful posting, poster (advertising) unrelated to the jobsite affixed to the sidewalk shed on protective structure as per code 3301.9.7 (no sign
Oct 4, 2024 · Penalty $2,530
Active - Class - 2
At the time of inspection, i observed that there was no occupant protection plan (opp/tpp) on site as required for the safety of commercial building occupants per (bc 3303.10). stop all suspended and supported
May 24, 2024
Resolve - Class - 2
At the time of inspection, i observed the following conditions: outrigger beam 26' is not on the calculation chart; counterweight of #18 is not complete; motor 1200 lb. in use instead of 1000 lb. on cd5; and,
May 24, 2024
Resolve - Class - 2
Failure to maintain/display on site documents required by bc chapter 33.at time of inspection observed approved sidewalk shed drawings for exps #2 /#3 section not on site & not produced upon request.remedy:main
May 24, 2024 · Penalty $1,250
Resolve - Class - 1
At the time of inspection, i observed that there was no evidence or documentation on site showing that workers received or receive site safety orientation or refresher as required. stop all supported and suspen
May 24, 2024 · Penalty $5,000
Resolve - Class - 2
At the time of inspection, i observed that the side walk shed expo# 2/3 section was being used for the storage of equipment and materials contrary to bc 3307.6.5.4. remove all equipment and materials placed on
May 24, 2024 · Penalty $2,400
Resolve - Class - 2
Pedestrian protection does not meet code specifications. sws erected at exp 1&4 in unsafe condition (3307.6.5.1), 12 bolts caps missing on screws creates hazard to the public threat of sharp edges 3307.6.5.6, 2
Nov 13, 2023 · Penalty $2,400
Resolve - Class - 2
2:x:10; alarm bell not working properly, need to repair. 13:x:10; emergency lighting not working properly, need to repair. 40:o:2; secondary machinery space is dirty with rouge from the hoist cables, room needs
Aug 15, 2023 · Penalty $1,562
Resolve - Class - 2
13:x:10; emergency lighting not working properly,need to repair. 40:o:2; secondary machinery space is dirty covered in rouge from the hoist cables, need to clean machinery space. 54:o:2; hoist cables are covere
Aug 15, 2023 · Penalty $1,562
Resolve - Class - 2
Misc violation on as of right privately owned public space as per zr 37-751 and zr e 27-42 a plaque or other permanent sign shall be displayed as per requirements in the section of the zoning resolution refer t
Mar 17, 2022 · Penalty $5,000
Resolve - Class - 2
Pedestrian protection doesnt meet code spec atoi of 44styb observed sws erected in place@exp1,2,4 w/exposed bolts w/sharp edges,sharp edges create unsafe condition for pedestrians.cover exposed bolts&maintain s
Feb 25, 2022 · Penalty $2,400
Resolve - Class - 2
Pedestrian protection does not meet code specification.at time of inspecton on a 44 story observed sws erected.sws in place missing caps from the bolts at sws can create hazardous condition for pedestrian injur
Jul 28, 2021 · Penalty $2,400
Resolve - Class - 1
Failure to take required measures to protect public from documented unsafe facade. as noted a fisp3 unsafe notification was submitted to thedob on 10-31-2020 and as of 11/23/2020 safety measures are not adequat
Nov 23, 2020 · Penalty $10,000
Resolve - Class - 2
27-929.1 a.c.27-929.1,failure to complete the installation of a full system of automatic sprinklers and file a final sprinkler report prepared by a registered design professional by 7/1/19,in an office building
Jul 13, 2020 · Penalty $625
Resolve - Class - 2
Failure to file accepted amended cycle 7b report indicating correctionof unsafe condition in intial facades report required by 28-302.5 for control#700186. remedy: file acceptable report.
Jun 3, 2020 · Penalty $1,250
Active - Class - 2
Failure to provide flagger.note:at time of my inspection of a 44 storybldg i observed a sidewalk shed being erected at exposure 1.i noticed no flagger or control access while job was being performed.this was ca
Feb 18, 2020
Resolve - Class - 2
Ac279291-failure to complete the installation of a full system of automatic sprinklers and file a final sprinkler report prepared by a registered design professional by july 1,2019,in an office building 100 fee
Nov 15, 2019 · Penalty $1,250
Resolve - Class - 2
Built contrary to approved plans.at time of inspection in response to complaint#1521509 observed sidewalk/shed in place not erected as per approved drawings.the footing of shed leg installed in place does not f
Sep 23, 2019
Resolve - Class - 2
Failure to maintain sidewalk shed.@ time of inspection in response to complaint#1591509 observed sidewalk shed in place in unsound structural condition.the shed legs had unsound footing sitting on mta sidewalk
Sep 23, 2019
Resolve - Class - 2
Failure to submit a required cycle 8b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control # 800186. remedy: submit required technical
Oct 15, 2018 · Penalty $1,250
Resolve - Class - 2
Failure to comply with commissioners order contained in summons/violation #35264131r issue on 07/12/17,and to file a certificate of correction pursuant to 28.201.1 and 1rcny 102-01(d)(2).an acceptible certifica
Apr 9, 2018 · Penalty $1,250
Resolve - Class - 2
Failure to maintain sidewalk shed in code compliant manner. note: observed violating conditions in place i did inform building management and sidewalk shed company on september 22, to repair, the sidewalk shed
Oct 5, 2017 · Penalty $2,400
Resolve - Class - 2
Electrical work without a permit.installed light fixtures under the side walk shed without an electrical permit.rem:obtain permit.
Jul 20, 2017 · Penalty $2,000
Resolve - Class - 2
Failure to maintain exterior bldg roof interior side parapet-spaling brick-ne corner bulkhead stair 1 spalling brick-rusting cabinet no cover.roof beams and columns cover vertical and horizontal cracking-north
Jul 12, 2017 · Penalty $500
Active - Class - 2
3307.1failure to maintain sidewalk shed in code compliant manner.note:at time of inspection i observed sidwalk shed in need of maintenance including but not limited to broken mudsills,exposed bolts.remedy:compl
Mar 7, 2017 · Penalty $400
Resolve - Class - 2
Failure to file an acceptable amended cycle 7 report to this dept indicating correction of unsafe conditions described in initial local law fisp report. remedy: file an amended report following remedial repairs
Dec 11, 2015 · Penalty $830
Resolve - Class - 1
100## failure to report an elevator accident promptly. accident occurred 10-14-15 1:55pm personal injuries requiring medical attention.
Oct 28, 2015 · Penalty $1,000
Resolve - Class - 1
Sec. 3314.4.1.5 notification of adjustable suspended scaffold installation & removal prior to the final removal of the adjustable suspended scaffold. at the site the dept shall be notified at least 24hrs but
Jan 21, 2015
Resolve - Class - 1
Work w/o a perit: noted: at time of inspection 4 workers working removing scaffold plans & scaffold equipment @ 16 floor staging area. as per dob records alt permit is expired as of 6/24/14. no new permit was
Aug 19, 2014
Resolve - Class - 2
3310.8.3 failure to comply rules promolgated by the comm'r site safety role no site safety logs. at time of inspec.observed active facade work in progress 6-9 men working. when asked foreman if site safety mgr
May 14, 2014 · Penalty $830
Resolve - Class - 1
Failure to have site safety mgr or coordinator present as req'd.at time of inspec.observed active facade job in progress.6-9 men work repairing the exterior of 59 maiden lane.when ask the site foreman if the si
May 14, 2014 · Penalty $2,400
Resolve - Class - 2
During a building ( ) inspection of the above address. as part of the public plaza site plans by alfred easton poor architects dated jan 8 1964.the arcase portion of the public space is along william st. zr37-
Jul 22, 2013 · Penalty $800
Resolve
Complaints
- General
Signage missing
Jun 1, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 4, 2026 · Apt 2F
Close - Unsanitary condition
Garbage/recycling storage
Dec 7, 2025 · Apt BLDG
Close - Door/window
Door
Mar 27, 2025 · Apt 54A
Close - Unsanitary condition
Pests
Mar 27, 2025 · Apt 54A
Close - Heat/hot water
Entire building
Aug 29, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Aug 29, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Jun 11, 2024 · Apt 5
Close - Heat/hot water
Entire building
Jun 11, 2024 · Apt BLDG
Close - General
Janitor/super
Jul 1, 2023 · Apt E3
Close
Show 40 more ↓
- Heat/hot water
Entire building
Dec 25, 2022 · Apt BLDG
Close - Flooring/stairs
Floor
Aug 4, 2022 · Apt TEST
Close - General
Signage missing
Mar 26, 2022 · Apt BLDG
Close - General
Signage missing
Mar 25, 2022 · Apt BLDG
Close - General
Signage missing
Mar 25, 2022 · Apt BLDG
Close - Electric
Lighting
Jan 26, 2022 · Apt 7J
Close - Heat/hot water
Apartment only
Nov 18, 2021 · Apt TEST
Close - Elevator
Maintenance
Jun 27, 2021 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Apr 7, 2021 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Mar 25, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 30, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 28, 2020 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 24, 2020 · Apt 3B
Close - Paint/plaster
Ceiling
Mar 16, 2020 · Apt 1S
Close - Heat/hot water
Entire building
Mar 16, 2020 · Apt 1S
Close - Flooring/stairs
Floor
Mar 16, 2020 · Apt 1S
Close - Water leak
Heavy flow
Mar 16, 2020 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 16, 2020 · Apt 5FL
Close - Heat/hot water
Apartment only
Jan 16, 2020 · Apt 2
Close - Heat/hot water
Apartment only
Oct 1, 2019 · Apt 15
Close - Heat/hot water
Entire building
Oct 1, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 1, 2019 · Apt 15
Close - General
Ventilation system
Aug 19, 2019 · Apt 3FL
Close - General
Cabinet
Aug 19, 2019 · Apt 3FL
Close - General
Bell/buzzer/intercom
Aug 19, 2019 · Apt 3FL
Close - General
Ventilation system
Aug 19, 2019 · Apt 3FL
Close - General
Cabinet
Aug 19, 2019 · Apt 3FL
Close - General
Bell/buzzer/intercom
Aug 19, 2019 · Apt 3FL
Close - Plumbing
Water supply
Aug 19, 2019 · Apt 3FL
Close - Electric
No lighting
Aug 9, 2019 · Apt BLDG
Close - Paint/plaster
Ceiling
Jul 17, 2019 · Apt 14FL
Close - Water leak
Heavy flow
Jul 17, 2019 · Apt 14FL
Close - Water leak
Damp spot
Jun 25, 2019 · Apt TEST
Close - Heat/hot water
Apartment only
May 30, 2019 · Apt BLDG
Close - Unsanitary condition
Pests
Feb 28, 2019 · Apt 15
Close - Heat/hot water
Apartment only
Feb 28, 2019 · Apt 15
Close - Door/window
Door
Oct 2, 2018 · Apt BLDG
Close - Door/window
Door
Oct 2, 2018 · Apt 5
Close - Heat/hot water
Entire building
Oct 1, 2018 · Apt BLDG
Close - Unsanitary condition
Pests
Aug 10, 2018 · Apt 14FL
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Office building (O4)
- Year built
- 1965
- Floors
- 44
- Residential units
- —
- Building area
- 1,073,000 ft²
- Lot area
- 59,391 ft²
- Zoning
- C5-5
- Community board
- 101
- Council district
- 1
- Block / lot
- 67 / 1
- Assessed value
- $99,049,050
- Landmark / historic district
- No
Questions about 59 Maiden Lane
Who owns 59 Maiden Lane?
The owner of record in NYC Department of City Planning PLUTO data is 59 Maiden Lane Assoc LLC.
Does 59 Maiden Lane have violations?
NYC HPD has no housing violations on record for this property.
Is 59 Maiden Lane rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 59 Maiden Lane built?
City records list 1965 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.