18 Pine Street
Manhattan, NY 10005BBL 1-00044-7501Map
Owner of record: Unavailable Owner
18 Pine Street is a condominium built in 1928 in Manhattan, 10005. It has 408 residential units across 38 floors. The owner of record is Unavailable Owner. HPD has recorded 28 housing violations here, most recently on August 25, 2022. 26 of the 28 most recent violations are still open.
- HPD violations
- 28
- DOB violations
- 46
- ECB violations
- 22
- HPD complaints
- 90
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 28
- ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Aug 25, 2022
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Aug 25, 2022
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Aug 25, 2022
Open — Nov sent out - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Aug 25, 2022
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Aug 25, 2022
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system sign missing at public hall, 1st story
Aug 25, 2022
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story
Aug 25, 2022
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box sign missing at public hall, 1st story
Aug 25, 2022
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Oct 25, 2021
Open — Nov sent out - ANon-hazardous
Replace with new the missing safety cover or plugs at electric outlet at all walls at public hall, 32nd story
Oct 25, 2021
Open — Nov sent out
Show 18 more ↓
- ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Oct 25, 2021
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Oct 25, 2021
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Oct 25, 2021
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, north and south walls in the 2nd room from east located at apt aptph3, 32nd story, 1st apartment from north at east
Oct 25, 2021 · Apt APTPH3
Open — Nov sent out - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Oct 25, 2021
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Oct 25, 2021
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Oct 25, 2021
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Oct 25, 2021
Open — Nov sent out - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the 2nd room from east located at apt aptph3, 32nd story, 1st apartment from north at east
Oct 25, 2021 · Apt APTPH3
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and north wall in the 2nd bathroom from east located at apt aptph3, 32nd story, 1st apartment from north at east
Oct 25, 2021 · Apt APTPH3
Open — Nov sent out - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the 2nd bathroom from east located at apt aptph3, 32nd story, 1st apartment from north at east
Oct 25, 2021 · Apt APTPH3
Open — Nov sent out - ANon-hazardous
Replace with new the missing safety cover or plugs at electric outlet at all walls at public hall, 1st story
Oct 25, 2021
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Sep 16, 2021
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Sep 16, 2021
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Sep 16, 2021
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Sep 16, 2021
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 6, 2017
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 1, 2015
Closed — Violation dismissed
DOB building violations · 46
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2024
Dob violation - active - Residential elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Dec 17, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 3, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 3, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 3, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 3, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 3, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 3, 2020
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 14, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 14, 2019
Dob violation - resolved
Show 36 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Feb 14, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 13, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 13, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 13, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 1, 2018
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 12, 2017
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Feb 21, 2017
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 30, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 30, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 30, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 30, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 30, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 30, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 30, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 30, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 30, 2016
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2015
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 28, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 28, 2015
Dob violation - resolved - Failure to submit eer none
Failure to submit an energy efficiency report in 2014 per ad. code sec. 28-308.4
Dec 31, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 27, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 27, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 29, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 18, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 18, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 18, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 23, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 23, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 23, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 23, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 8, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 2, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 1, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 28, 2010
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 20, 2006
Dob violation - resolved - Elevator elevatorrequired
(51)cease use of elevator until hole in car enclosure is eliminat ed (52)replace car flooring (eliminate tripping hazzard)
Jan 9, 1989
Dob violation - resolved
ECB violations · 22
- Class - 2
Class 2: upon inspection of elevators car #4 is out of service due to worn bearings, return to service. class 2: car #6 guide rollers worn causing scrapping on travel, repair and adjust worn rollers.
Feb 18, 2025
Resolve - Class - 2
97//x/17 restore to service for proper inspection by dob.
Aug 2, 2023 · Penalty $625
Resolve - Class - 2
Failure to maintain exterior bldg facades/walls&appurtenances.note:exp2w elevation:broken/spalled [email protected] elevation:missing glass panel.maintain exterior bldg facades/walls&appurtenances.provide sa
May 13, 2022
Resolve - Class - 2
Failure to provide approved/accepted construction docs.at jobssite.at time of inspection at an active jobsite,i observed facade work being done on exp4 from a suspended scaffold.upon request for a cd-5,the cont
Jul 29, 2019 · Penalty $312
Resolve - Class - 2
Sec. 28-104.8.4.3 failure to post notice of tenant protection plan-at time of inspection i observed the contractor using tenants apts to access work area. i also observed scaffolsing & equipment in tenant & com
Jan 30, 2019
Resolve - Class - 2
Sec. 27-2009.2 failure to distribute or post safe construction bill of rights. at the time of inspection of a facade restoration project i observed the contractor using tenants apts to access work areas. i obse
Jan 30, 2019
Resolve - Class - 2
Failure to file annual certification that cooling tower 1000001591 hasbeen inspected,tested,and disinfected and that a maintenance plan has been developed and implemented by november,1,2016.rem:file annual cert
Jun 22, 2017
Resolve - Class - 1
Failure to take and provide safety measures (sidewalk shed, netting etc) where require to protect and secure public safety from documentedunsafe facade as per 14cny 103-04. facade technical report filed unsaf
Apr 14, 2017 · Penalty $2,400
Resolve - Class - 2
Failure to provide approved/accepted plans at job site at time of inspection. noted: at time of inspection construciton & renovation work inprogress at 1st fl north east corner under permit #122540875 plan on
Nov 18, 2015
Resolve - Class - 2
Work does not conform to approved construction documents and or approved plan.note:the approved plans for proposed ramp permit #140202714 indicates that ramp to(cantilevered)entirely from the facade of the bldg
Jun 29, 2015 · Penalty $500
Resolve
Show 12 more ↓
- Class - 2
Failure to provide approved/accepted plans at job site at time of insp.observ active const @ 1st fl retail space with men on scissor lifts install mechanicals.no plans are available for insp"stop all work"make
Sep 11, 2014 · Penalty $250
Resolve - Class - 1
3310.8.3 failure to comply rules promulgated by the commissioner-sitesafety rule noted: last entry on site manager's log was on 7/31/13 - other logs such as shed and suspended scaffolding are to date.rmdy:sto
Aug 28, 2013
Resolve - Class - 3
98bb5.98bb5 file and perform 5yr test
Dec 15, 2009 · Penalty $500
Resolve - Class - 1
Failure to safeguard all persons and property affected by constructionoperation during inspection it was noticed that window stop became dislodged and fell apprx 4 stories to court area striking pedestrian
Aug 19, 2008
Resolve - Class - 1
Failure to notify the dob of an accident involving construction. during inspection it was seen that window stop fell 4 stories striking a pedestrian at that time no one at the construction site notified dob wor
Aug 19, 2008 · Penalty $8,000
Resolve - Class - 2
Work w/o a permit expired permit during inspection it was seen that permit for alt# 104235132 for the conversion to residential has expired 08/11/08. remedy: stop all work obtain permit.
Aug 19, 2008 · Penalty $2,500
Resolve - Hazardous
Failure to post contractors sign. upon inspection of above address bldg to roof construction work thruout bldg in progress! no contractors sign posted. remedy: post sign.
Mar 20, 2008 · Penalty $500
Resolve - Non-hazardous
Sec. 27-194. no permit posted. noted: bldg to roof, construction work in progress. no permits posted. remedy: post permits.
Mar 20, 2008 · Penalty $200
Resolve - Non-hazardous
84r07. 84r inside new elev w/ walls no handicap provision/handrails;provide.
Dec 28, 2007 · Penalty $180
Resolve - Hazardous
Work contrary to approved plans. note: shed parapets walls installed are 8' & 16' which exceeds height approved on plans. remedy: conform toplans.
Apr 6, 2007 · Penalty $500
Resolve - Non-hazardous
67m12. broken teeth lower learing
Jun 28, 2002
Resolve - Non-hazardous
Failure to file a report of compliance with local law 16/84 certifyingto the installation of required fire protection systems. remedy: file report
Feb 14, 1997 · Penalty $500
Resolve
Complaints
- Plumbing
Water supply
Jul 23, 2025 · Apt 1612
Close - Unsanitary condition
Mold
Sep 8, 2022 · Apt PH32
Close - Water leak
Heavy flow
Aug 15, 2022 · Apt PH32
Close - Water leak
Heavy flow
Sep 2, 2021 · Apt PH32
Close - Water leak
Slow leak
Aug 26, 2021 · Apt APTPH3
Close - Water leak
Slow leak
Aug 26, 2021 · Apt PH32
Close - Heating
Heat related
Nov 7, 2012 · Apt 714
Close - Heating
Heat related
Nov 7, 2012 · Apt NA
Close - Heating
Heat related
Nov 7, 2012 · Apt 714
Close - Heating
Heat related
Nov 7, 2012 · Apt NA
Close
Show 40 more ↓
- Heating
Heat related
Nov 7, 2012 · Apt 1404
Close - Heating
Heat related
Nov 7, 2012 · Apt 506
Close - Heating
Heat related
Nov 7, 2012 · Apt 1719
Close - Heating
Heat related
Nov 7, 2012 · Apt 403
Close - Heating
Heat related
Nov 7, 2012 · Apt 403
Close - Heating
Heat related
Nov 7, 2012 · Apt 403
Close - Heating
Heat related
Nov 7, 2012 · Apt NA
Close - Heating
Heat related
Nov 7, 2012 · Apt 1606
Close - Heating
Heat related
Nov 7, 2012 · Apt 618
Close - Heating
Heat related
Nov 7, 2012 · Apt NA
Close - Heating
Heat related
Nov 7, 2012 · Apt NA
Close - Heating
Heat related
Nov 7, 2012 · Apt 1807
Close - Heating
Heat related
Nov 6, 2012 · Apt NA
Close - Heating
Heat related
Nov 6, 2012 · Apt NA
Close - Heating
Heat related
Nov 6, 2012 · Apt NA
Close - Heating
Heat related
Nov 6, 2012 · Apt NA
Close - Heating
Heat related
Nov 6, 2012 · Apt NA
Close - Heating
Heat related
Nov 6, 2012 · Apt 506
Close - Heating
Heat related
Nov 6, 2012 · Apt NA
Close - Heating
Heat related
Nov 6, 2012 · Apt NA
Close - Heating
Heat related
Nov 6, 2012 · Apt NA
Close - Heating
Heat related
Nov 6, 2012 · Apt 1606
Close - Heating
Heat related
Nov 6, 2012 · Apt NA
Close - Heating
Heat related
Nov 6, 2012 · Apt 5F
Close - Heating
Heat related
Nov 6, 2012 · Apt 1009
Close - Heating
Heat related
Nov 6, 2012 · Apt 2303
Close - Heating
Heat related
Nov 6, 2012 · Apt NA
Close - Heating
Heat related
Nov 6, 2012 · Apt NA
Close - Heating
Heat related
Nov 6, 2012 · Apt 2602
Close - Heating
Heat related
Nov 6, 2012 · Apt NA
Close - Heating
Heat related
Nov 6, 2012 · Apt 402
Close - Heating
Heat related
Nov 6, 2012 · Apt 1817
Close - Heating
Heat related
Nov 6, 2012 · Apt 1817
Close - Heating
Heat related
Nov 6, 2012 · Apt 2303
Close - Heating
Heat related
Nov 6, 2012 · Apt NA
Close - Heating
Heat related
Nov 6, 2012 · Apt 2506
Close - Heating
Heat related
Nov 6, 2012 · Apt NA
Close - Heating
Heat related
Nov 6, 2012 · Apt NA
Close - Heating
Heat related
Nov 6, 2012 · Apt NA
Close - Heating
Heat related
Nov 6, 2012 · Apt 2310
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (RM)
- Year built
- 1928
- Floors
- 38
- Residential units
- 408
- Building area
- 461,169 ft²
- Lot area
- 22,742 ft²
- Zoning
- C5-5
- Community board
- 101
- Council district
- 1
- Block / lot
- 44 / 7501
- Assessed value
- $74,360,844
- Landmark / historic district
- No
HPD registration #143106, last renewed Sep 10, 2025.
Questions about 18 Pine Street
Who owns 18 Pine Street?
The owner of record in NYC Department of City Planning PLUTO data is Unavailable Owner.
Does 18 Pine Street have violations?
Yes. NYC HPD has recorded 28 housing violations at this property.
Is 18 Pine Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 18 Pine Street built?
City records list 1928 as the year it was built.
How many apartments are in 18 Pine Street?
It has 408 residential units and 412 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.