7 Hanover Square
Manhattan, NY 10004BBL 1-00030-7501Map
Owner of record: 7 Hanover Fee Owner Co. LLC
7 Hanover Square is a condominium built in 1983 in Manhattan, 10004. The owner of record is 7 Hanover Fee Owner Co. LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 10
- ECB violations
- 18
- HPD complaints
- 3
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 10
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 3, 2024
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2024
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 21, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 23, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 2, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 28, 2021
Dob violation - dismissed
ECB violations · 18
- Class - 2
At the time of my inspection for suspended scaffold notification observed suspended scaffold removed from site-after talking to building management(engineer)-work complete all equipment removed from site-no rem
Nov 15, 2025 · Penalty $2,500
Resolve - Class - 2
Failure to file required annual boiler inspection reports for low-pressure boiler 10000171330n0004 in accordance with the rules of the department. 1rcny 103-01(d)(1) requires that an annual inspection report fo
Jul 1, 2025
Resolve - Class - 2
Failure to file required annual boiler inspection reports for low-pressure boiler 10000171330n0003 in accordance with the rules of the department. 1rcny 103-01(d)(1) requires that an annual inspection report fo
Jul 1, 2025
Resolve - Class - 2
Failure to file required annual boiler inspection reports for low-pressure boiler 10000171330n0005 in accordance with the rules of the department. 1rcny 103-01(d)(1) requires that an annual inspection report fo
Jul 1, 2025
Resolve - Class - 2
Failure to file required annual boiler inspection reports for low-pressure boiler 10000171330n0006 in accordance with the rules of the department. 1rcny 103-01(d)(1) requires that an annual inspection report fo
Jul 1, 2025
Resolve - Class - 2
Held self out as licensed certified registered etc to perform work requiring dob license w/o obtaining such license. at time of inspection observed in cellar 10" gas pipe being welded.onsite welder mitott r car
Jul 27, 2021 · Penalty $500
Resolve - Class - 1
Work does not conform to approved construction documents noted at the time of my inspection of an active jobsite upon reviewing needle beam plan section m00424162-p1 show corrupted tins to bc install on top the
Apr 30, 2021 · Penalty $2,500
Resolve - Class - 1
3314.1 failure to maintain supported pipe scf note:@time of my insp observed active jobsite.supported pipe scf installed@28fl w.needle beam for exterior work arent maintained as required.supported pipe scf miss
Apr 5, 2021 · Penalty $625
Resolve - Class - 1
Failure to notify the department of an accident that resulted in a fatality or an injury.note a worker fell approx 5ft from a ladder injuring his left shoulder.the worker was transported to a hospital for treat
Mar 11, 2021 · Penalty $5,000
Resolve - Class - 1
Work does not conform to document(ssp). note: at time of my inspectionof a 28 sty bldg under alteration job vertical extention & renovation.i observed turnstile installed at exp#2 on water street as a means of
Feb 12, 2021 · Penalty $625
Resolve
Show 8 more ↓
- Class - 2
Failure to institute & maintain safety measures. note: at time of my inspection in response to an incident where 1 worker fell from a frame ladder during framing operation injured his arm & was taken to hospita
Feb 12, 2021 · Penalty $625
Resolve - Class - 1
Failure to have safety orientation. note: at time of my inspection where 1 worker fell from a frame ladder on 28th fl during framing operation & was taken to hospital. upon request for the copy of his site safe
Feb 12, 2021 · Penalty $2,500
Resolve - Class - 2
Failure to maintain building exterior walsl facade and or appurtennaces at the time of my isnepction i observed damaged.degraded masonry joints chipped out spalled brickface an broken window (under construction
Feb 5, 2021 · Penalty $1,250
Resolve - Class - 1
1 rcny 103-04 owner failed to repair swarm conditiosn in a timely manner on 02-05-2021 i observed noted defected chipped bricks defective mortar joints and ongoing work at east ,west and north exposure the pre
Feb 5, 2021 · Penalty $1,250
Resolve - Class - 2
Unapproved unsafe unsuitable electrical equipment apparatus materials devices appliances or wiring in use defective wiring & conduit die to drilling causing elecrical orfeeder conductor in basement comply
Dec 30, 2020
Resolve - Class - 1
Failure to institute and maintain safety measures during operation.note:at time of my inspection of 26 story building in response to an incident where one worker(carpenter)injured his face when he was doing met
Dec 30, 2020
Resolve - Class - 2
Pedestrian protection does not meet code specification at the time of inspection at an active jobsite observed,the sidewalk shed is erected in place and there were exposed bolts with sharp edge not capped,and t
Aug 19, 2020
Resolve - Class - 1
Failure to safeguard all persosn and proeprty affected by cosntruction operations at time of inspection respond to a incident on the 2nd floor inspection reveal a spock got into the void area in the staircase a
Aug 12, 2020 · Penalty $10,000
Resolve
Complaints
- Unsanitary condition
Pests
Aug 13, 2026 · Apt 8THFLO
Close - Unsanitary condition
Pests
Aug 13, 2026 · Apt 8
Close - Unsanitary condition
Garbage/recycling storage
Aug 3, 2017 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (RC)
- Year built
- 1983
- Floors
- 29
- Residential units
- —
- Building area
- 709,912 ft²
- Lot area
- 34,699 ft²
- Zoning
- C5-5
- Community board
- 101
- Council district
- 1
- Block / lot
- 30 / 7501
- Assessed value
- $161,642,754
- Landmark / historic district
- No
Questions about 7 Hanover Square
Who owns 7 Hanover Square?
The owner of record in NYC Department of City Planning PLUTO data is 7 Hanover Fee Owner Co. LLC.
Does 7 Hanover Square have violations?
NYC HPD has no housing violations on record for this property.
Is 7 Hanover Square rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 7 Hanover Square built?
City records list 1983 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.