82 Beaver Street
Manhattan, NY 10005BBL 1-00028-7501Map
Owner of record: Cocoa Exchange Condo
82 Beaver Street is a condominium built in 1904 in Manhattan, 10005. It has 126 residential units across 15 floors. The owner of record is Cocoa Exchange Condo. HPD has recorded 21 housing violations here, most recently on March 15, 2023. 19 of the 21 most recent violations are still open.
- HPD violations
- 21
- DOB violations
- 79
- ECB violations
- 40
- HPD complaints
- 34
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 21
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 15, 2023
Closed — Violation dismissed - BHazardous
Remove all obstructions and repair all defects in atwaste line at bathtub in the bathroom located at apt 1408, 14th story, 2nd apartment from east at south
Dec 22, 2022 · Apt 1408
Open — Nov certified late - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 1408, 14th story, 2nd apartment from east at south
Dec 22, 2022 · Apt 1408
Open — Nov certified late - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 1408, 14th story, 2nd apartment from east at south
Dec 22, 2022 · Apt 1408
Open — Nov certified late - ANon-hazardous
Properly repair the broken or defective electrical outlet at east wall in the 1st room from east located at apt 1408, 14th story, 2nd apartment from east at south
Dec 22, 2022 · Apt 1408
Open — Nov certified late - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Aug 10, 2021
Open — Nov certified late - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system ... at public hall, 1st story
Aug 10, 2021
Open — Nov certified late - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Aug 10, 2021
Open — Nov certified late - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Aug 10, 2021
Open — Nov certified late - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Aug 10, 2021
Open — Nov certified late
Show 11 more ↓
- ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Aug 10, 2021
Open — Nov certified late - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Aug 10, 2021
Open — Nov certified late - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... 10 sq ft at east wall in the 1st room from east located at apt 808, 8th story, 2nd apartment from north at east
Dec 11, 2019 · Apt 808
Open — Defect letter issued - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 1st room from east located at apt 808, 8th story, 2nd apartment from north at east
Dec 11, 2019 · Apt 808
Open — Nov certified late - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from east located at apt 808, 8th story, 2nd apartment from north at east
Dec 11, 2019 · Apt 808
Open — Nov certified late - BHazardous
Properly repair the broken or defective electric bell buzzer intercom system in the entrance located at apt 301, 3rd story, 4th apartment from east at south
Mar 22, 2016 · Apt 301
Open — Nov certified late - BHazardous
M/d law abate the nuisance consisting of moisture penetrating at ceiling in the bathroom located at apt 1501, 15th story, 4th apartment from north at east
Mar 27, 2011 · Apt 1501
Open — Nov certified late - BHazardous
M/d law abate the nuisance consisting of moisture penetrating at ceiling in the foyer located at apt 1501, 15th story, 4th apartment from north at east
Mar 27, 2011 · Apt 1501
Open — Nov certified late - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the bathroom located at apt 1501, 15th story, 4th apartment from north at east
Mar 27, 2011 · Apt 1501
Open — Nov certified late - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and south wall in the foyer located at apt 1501, 15th story, 4th apartment from north at east
Mar 27, 2011 · Apt 1501
Open — Nov certified late
DOB building violations · 79
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Landmark none
Landmk-landmark none
Sep 28, 2023
Dob violation - dismissed - Landmark none
Landmk-landmark none
Sep 28, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - dismissed
Show 40 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Jan 29, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 29, 2021
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 5, 2020
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 27, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 27, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 27, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 27, 2020
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2018
Mar 18, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 28, 2019
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 19, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 21, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 21, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 21, 2016
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 2, 2015
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 20, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 20, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 20, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 20, 2015
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 21, 2014
Dob violation - dismissed - Facade facade optional
Cycle 7 unsafe report filed
Mar 21, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 27, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 27, 2014
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 14, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 13, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 20, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 12, 2009
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 12, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 11, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 11, 2009
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 11, 2009
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 10, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 10, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 10, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 10, 2009
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 10, 2009
Dob violation - resolved
ECB violations · 40
- Class - 2
Obs. closed site of alt. for 15-story bldg. material storage placed @ street level on corner of expo 1 &expo 4. onsite conditions show loose netting facing the public sidewalk, with materials stored in this are
Aug 16, 2026 · Penalty $2,400
Resolve - Class - 2
3301.9.6; obs. closed site of alt of 15 story bldg with sws installed on expo 1,2,4. @ expo 1, sws parapet panel has unlawful signs @ a flag. @ expo 2&4, an unlawful temp. banner is tied to sws posts & flags ti
Aug 16, 2026 · Penalty $2,500
Resolve - Class - 1
Failure to comply w/the comm's order contained in summons/vio#35432273m issued on 11/14/19 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. for work w/o a permit. remedy: comply w/comm's orde
Feb 3, 2020
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#39013297x issued on 11-21-19 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. no c of c on file. remedy: comply w/comm's order &/or file a c
Jan 6, 2020
Resolve - Class - 1
Tampered with, removed, or defaced a written posted stop work order. noted swo written and posted on 11/14/2019 has been removed from double doors to basement where it was posted. building management state cont
Nov 21, 2019
Resolve - Class - 1
Work without permit.*stop all demolition work and make site safe*at the time of inspectin observed full demolition work of the interior space on the lower level and/or basement to include concrete mills floor,e
Nov 14, 2019
Resolve - Class - 2
Bc 3314.4.3.1 failure to provide pre-installation insp report @time ofinsp (suspended scaffolds) noted:@time of insp suspended scaffolds were in the process of being installed @the site.no pre installation insp
Sep 3, 2015
Resolve - Class - 1
Bc 3310.4 failure to comply with the site safety program.(site safety manager) ike chibuzor has never been to the jobsite.pswo:issued & posted.(stop all scaffold work) noted:@time of my insp of job#122382055 wo
Sep 3, 2015
Resolve - Class - 1
Unqualified worker performing scaffolding work.(suspended scaffold)(fake card) noted:@time of insp suspended scaffold worker (raymier a martes) was in the process of installing a suspended scaffold.the training
Sep 3, 2015 · Penalty $1,600
Resolve - Class - 1
Failure to maintain bldg wall(s) or appurtenances. defect noted: at exterior wall exps 2 and 3, between beaver street and pearl st. top flrs (14th & 15th stories) terra cotta is crumbling and small pcs are
Feb 19, 2014 · Penalty $1,000
Resolve
Show 30 more ↓
- Class - 2
88i11. 88 repair handrail.
Oct 28, 2008
Resolve - Class - 1
Work w/o a permit. location and work noted: removed manual fire pump from 23rd flr. remedy: obtain permit or restore premises to prior legalcondition.
Oct 22, 2008
Resolve - Class - 2
88111. 88 change defective hand rails
Oct 22, 2008
Resolve - Class - 1
Work w/o a permit location and work noted removal manual fire pump from 23fl remedy: obtain permit or restore premises to prior legal condition
Oct 22, 2008
Resolve - Class - 2
88i11.88 repair hand rail
Oct 20, 2008
Resolve - Class - 2
88i11.88 repair escalator handrails
Oct 20, 2008
Resolve - Class - 2
88i 88 repair damaged handrail
Oct 20, 2008
Resolve - Class - 2
88i11 88 repair handrails
Oct 20, 2008
Resolve - Class - 2
88i11 88 repair damaged handrail
Oct 20, 2008
Resolve - Class - 2
88u10 88 repair damaged handrail
Oct 20, 2008
Resolve - Class - 1
Fail to safe guard all persons & property affected by const ops. notedmen are using a material hoist over the street & there is no flag men present. pedestrians & myself are walking directly under material bein
Aug 4, 2008 · Penalty $2,400
Resolve - Class - 1
Sec bc 3314.4.2 misc viol: every damaged or weakened scaffold shall beimmediately repaired or secured & shall not be used until satisfactoryrepairs have been completed & the scaffold is inspected under the prov
Aug 4, 2008 · Penalty $400
Resolve - Class - 2
Fail to maintain adequate housekeeping. noted there is a shed w/supported scaffold on it. there is excessive material & debris on shed. varyminimal walk way is provided. remedy: maintain adequate housekeeping.
Aug 4, 2008
Resolve - Class - 2
Failure to provide/post sign(s) at job site pursuant to subsection. noted: there is work being performed on site there is no general contractors sign. remedy: provide contractor's sign.
Aug 4, 2008 · Penalty $400
Resolve - Class - 2
Failure to provide approved/accepted plans at job site at time of inspnoted there is a side walk shed & approx 160' of supported. there are no plans (approved) available for inspection. remedy: provide plans.
Aug 4, 2008 · Penalty $500
Resolve - Class - 3
98bb05.41t07. 98bb perform & file current 5yr test 41t provide label on secondary door
Jul 7, 2008
Resolve - Non-hazardous
73b14:(73-b-14) shorten compenstaing ropes.
Apr 8, 2008
Resolve - Non-hazardous
73b14:(73-b-14) shorten compenstaing ropes
Apr 8, 2008
Resolve - Non-hazardous
73b14: (73-b-14) shorten compensating ropes
Apr 8, 2008
Resolve - Non-hazardous
Altered bldg occupied w/o a valid certificate of occupancy.in that cetificate of occupancy#103836690 t008 expired on 8/19/07.remedy:obtain avalid c of o.
Sep 21, 2007
Resolve - Non-hazardous
Exit passage or corridor required width decreased by obstruction. egress pathway "a"is now obstructed by file & other related items from 5thto 7th flr. remedy: remove obstruction.
Aug 15, 2007
Resolve - Non-hazardous
Failure to provide approved plans at premises at time of inspection. note: interior demo is being performed at 1 flr commercial space under application # 104735137 with approve plans on premises. remedy: stop
May 16, 2007 · Penalty $2,500
Resolve - Non-hazardous
Noted: failure to post permit holder sign as required by admin. code. remedy: post sign as required.
Aug 30, 2005 · Penalty $200
Resolve - Non-hazardous
Noted: contrary to approved plans #103854072-sidewalk shed vertical side panels are approx. 8' high. remedy: conform to approved plans.
Aug 30, 2005 · Penalty $250
Resolve - Non-hazardous
Altered building occupied without a valid certificate of occupancy basement and 1st floor under alteration #102484483. approved apr 10, 2001. remedy: obtain a valid certificate of occupancy or discontinue use.
Jul 29, 2005 · Penalty $350
Resolve - Non-hazardous
Exit passageway or corridor total. chairs -tables- new construction stair #5. remedy: remove obstruction.
Jul 29, 2005 · Penalty $480
Resolve - Hazardous
74,b,01 75,m,07 59,b,06 80,b, 74/b como plate sort a not working properly adjust 75/m right side bottom finger guarde hoising 80/b inspection incomplete call 21 566-5542 before returning to service
Jun 24, 2003 · Penalty $500
Resolve - Non-hazardous
75u05.
Jul 2, 2002 · Penalty $2,500
Resolve - Non-hazardous
50o50y46o37g10d20d57o02x74d14b51e 50-clean machine 50-seal machine 46-clean exxessive grease off cable 37-remove of fuses replace w/new 100 properly seucre station 20-secure hall button sattin in hatch way lobb
Feb 6, 1998
Resolve - Non-hazardous
Failure to provide emergency power exit lights connecting staircases on various floor throughout bldg(i.e floor #4,6,8,9+15) remedy:provideemergency power exit lights according to b.e.c staircase as per code l
Jun 20, 1995 · Penalty $400
Resolve
Complaints
- Elevator
Maintenance
Aug 19, 2026 · Apt BLDG
Close - Elevator
Maintenance
Aug 19, 2026 · Apt BLDG
Close - Elevator
Maintenance
Aug 19, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 28, 2026 · Apt BLDG
Close - Plumbing
Water supply
Jul 28, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 26, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 25, 2026 · Apt 201
Close - Heat/hot water
Entire building
Jan 19, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 14, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 8, 2026 · Apt BLDG
Close
Show 24 more ↓
- General
Tenant harassment
Dec 9, 2022 · Apt 1408
Close - Plumbing
Bathtub/shower
Dec 9, 2022 · Apt 1408
Close - Plumbing
Radiator
Dec 9, 2022 · Apt 1408
Close - Electric
Power outage
Sep 2, 2021 · Apt BLDG
Close - Unsanitary condition
Mold
Dec 5, 2019 · Apt 808
Close - Heat/hot water
Apartment only
Mar 22, 2018 · Apt 706
Close - Unsanitary condition
Mold
Mar 22, 2018 · Apt 706
Close - Safety
Smoke detector
Mar 22, 2018 · Apt 706
Close - Paint/plaster
Wall
Mar 22, 2018 · Apt 706
Close - Heat/hot water
Apartment only
Nov 26, 2017 · Apt 1403
Close - Heat/hot water
Entire building
Nov 26, 2017 · Apt BLDG
Close - Appliance
Refrigerator
Apr 3, 2016 · Apt 301
Close - Door/window
Window frame
Mar 20, 2016 · Apt 301
Close - General
Bell/buzzer/intercom
Mar 20, 2016 · Apt 301
Close - Electric
Outlet/switch
Mar 20, 2016 · Apt 301
Close - Appliance
Electric/gas range
Mar 20, 2016 · Apt 301
Close - Plumbing
Toilet
Mar 20, 2016 · Apt 301
Close - Unsanitary condition
Mold
Mar 20, 2016 · Apt 301
Close - Safety
Smoke detector
Mar 20, 2016 · Apt 301
Close - Safety
Carbon monoxide detector
Mar 20, 2016 · Apt 301
Close - Heat/hot water
Apartment only
Mar 20, 2016 · Apt 301
Close - Heating
Heat related
Nov 21, 2011 · Apt 202
Close - Plumbing
Water-leaks
Mar 16, 2011 · Apt 1501
Close - Plumbing
Water-leaks
Mar 16, 2011 · Apt 1501
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (RM)
- Year built
- 1904
- Floors
- 15
- Residential units
- 126
- Building area
- 93,544 ft²
- Lot area
- 7,120 ft²
- Zoning
- C5-5
- Community board
- 101
- Council district
- 1
- Block / lot
- 28 / 7501
- Assessed value
- $14,824,746
- Landmark / historic district
- INDIVIDUAL LANDMARK
HPD registration #142777, last renewed Aug 30, 2025.
Questions about 82 Beaver Street
Who owns 82 Beaver Street?
The owner of record in NYC Department of City Planning PLUTO data is Cocoa Exchange Condo.
Does 82 Beaver Street have violations?
Yes. NYC HPD has recorded 21 housing violations at this property.
Is 82 Beaver Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 82 Beaver Street built?
City records list 1904 as the year it was built.
How many apartments are in 82 Beaver Street?
It has 126 residential units and 128 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.