40 Exchange Place
Manhattan, NY 10005BBL 1-00025-0027Map
Owner of record: 40 X Owner LLC
40 Exchange Place is an office building built in 1902 in Manhattan, 10005. The owner of record is 40 X Owner LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 161
- ECB violations
- 98
- HPD complaints
- 2
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 161
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 8, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 8, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 8, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 8, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 8, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 8, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 8, 2021
Dob violation - resolved - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2019)
Jun 29, 2020
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2018)
Jun 28, 2020
Dob violation - dismissed
Show 40 more ↓
- Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2017
Jun 27, 2020
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 17, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 17, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 17, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 17, 2020
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Sprinkler none
Failed to file final sprinkler report by july 1, 2019
Sep 3, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 24, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 24, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 24, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 22, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 22, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 22, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 22, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 22, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 22, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 22, 2018
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection rep report
Feb 24, 2017
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 17, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 17, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 17, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 17, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 17, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 17, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 17, 2017
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Residential elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Jun 1, 2016
Dob violation - dismissed - Residential elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Jun 1, 2016
Dob violation - dismissed - Residential elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Jun 1, 2016
Dob violation - dismissed - Residential elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Jun 1, 2016
Dob violation - dismissed - Residential elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Jun 1, 2016
Dob violation - dismissed
ECB violations · 98
- Class - 1
At the time of my inspection observed active site permit #m01233357-i1 in accordance with m01326925-i1 failed to provide details for all documents for erected suspended scaffold @ exp. 1 & 2.bc 3301.7 (2014 cod
Jul 18, 2026 · Penalty $2,500
Resolve - Class - 1
At the time of my inspection observed active site with permit # m01233357-i1 in accorance with #m01326925-i1 site erected suspended scaffold @ exp. 1&2 with makeshift tie-ins contrary to approve plans(28-105.12
Jul 18, 2026 · Penalty $2,500
Resolve - Class - 2
Responding to an incident where a worker hurt his back while attempting to lift an electrical closet. inspection revealed that the electrical closet was approx. 150 lbs. there were no appliance dolly, mobile ma
May 14, 2026 · Penalty $5,000
Active - Class - 2
27-929.1 failure to complete the installation of a full system of automatic sprinklers and file a final sprinkler report prepared by a registered design professional in an office building 100 feet or more in he
Feb 28, 2023 · Penalty $3,125
Resolve - Class - 2
Sec. 27-929.1 failure to complete the installation of a full system ofautomatic sprinklers & file a final sprinkler report prepared by a registered design professional in an office bldg 100 feet or more in heig
Mar 30, 2021 · Penalty $3,125
Resolve - Class - 2
27-929.1 a.c. 27-929.1,failure to complete the installation of a full system of automatic sprinklers and file a final sprinkler report prepared by a registered design professional by 7/1/19,in an office buildin
Nov 15, 2019 · Penalty $1,250
Resolve - Class - 2
Failure to maintain exterior building walls and appurtenances. noted: on exp2 east elevation i observed on 6th fl window sill north east endof building spalled, spalling masonry sill; 4th floor water table on
Dec 20, 2018 · Penalty $1,250
Resolve - Class - 2
Work without a permit.at 10th floor of the building found new mechanical work done prior to obtaining mechanical permit-obtain mechanical permit.
Jul 24, 2018 · Penalty $250
Resolve - Class - 2
Failure to maintain bldg walls and appurtenances. noted at time of in spection (i) at exp1 spalled and cracked masonry at decorative stone in front of flr 2 sill at 6th window line from east (ii) at exp2 (willi
Mar 19, 2018
Resolve - Class - 2
Failure to file annual certification that cooling tower 1000004932 hasbeen inspected,tested and disinfected and that a maintenance plan has been developed and implemented,by november,1,2016.rem:file annual cert
Jun 20, 2017 · Penalty $1,000
Resolve
Show 40 more ↓
- Class - 2
Failure to maintain adequate housekeeping per section requirements. noted: @ time of insp observed construction work in progress however observed construction materials & debris are placed @ hallway on 1st flr
Jun 12, 2017 · Penalty $400
Resolve - Class - 2
67m7 communication is missing provide outside communication in elevator.
Jan 4, 2017
Resolve - Class - 2
67m7 communication is missing provide outside communiation in elevator
Jan 4, 2017
Resolve - Class - 2
67m7 communication is missing provide outside communication in elevator.
Jan 4, 2017
Resolve - Class - 2
67m7 communication is missing provide outside communication in elev ator.
Jan 4, 2017
Resolve - Class - 2
67m7 communication is missing provide outside communication in eleva tor.
Jan 4, 2017
Resolve - Class - 2
67m7 communication is missing provide outside communication in eleva tor.
Jan 4, 2017
Resolve - Class - 2
67m7,42n9. communication is missing provide outside communication in elevator. remove jumper off controller jump from 15b to 18.
Jan 4, 2017
Resolve - Class - 2
Failure to file acceptable amended report indicating coarrection of u safe conditions described in initial local law 11/98 report.rem:file cceptabel amended report.
Nov 7, 2016 · Penalty $800
Resolve - Class - 2
Failure to file an acceptable technical report in compliance w/code provisions:periodic insp of exterior walls & appurtenances as required by article 28.302 & the dob rules & regulations.rem:file the required r
Sep 15, 2015 · Penalty $1,000
Resolve - Class - 2
Failuer to file an acceptable cycle 7 technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28-302 & the dept of bldgs rules & regulat
Apr 9, 2014 · Penalty $800
Resolve - Class - 1
Sec. 3314.6.2 supported scaffold doesn't meet code specifications. noted: at time of inspection suspended scaffold at interior courtyard -lifelines not protected -c-hook tie backs disconnected. remedy: comply
Oct 11, 2013 · Penalty $1,600
Resolve - Class - 2
02x10,68b07.(02x)alarm on aux station inoperative.(68b)incomplete log book.
Aug 21, 2012
Resolve - Class - 2
68b07,52m07.(68b)log book incomplete.(52m)hoist rope guards.
Aug 21, 2012
Resolve - Class - 2
42a09,68b07,52m07.(42a)remove wires used set testing on controller.(68b)maint log book incomplete.(52m)rope guards.
Aug 21, 2012
Resolve - Class - 2
Failure to file an acceptable 6th round technical report in compliancew/article 28.302 of the bldg code & dob's rules & regulations. 36017704n. respondent has demonstrated a history of non-compliance w/dept
Aug 12, 2012 · Penalty $2,000
Resolve - Class - 3
Work w/o a permit. work noted: at time of inspection demolition work performed including removal of hvac duct work,drop ceiling,light fixtures & walls. all work at 3rd fl done w/o permit. stop work at 3rd floor
Jul 10, 2012 · Penalty $200
Resolve - Class - 2
97x10;return elevator to service.
Jun 4, 2012 · Penalty $500
Resolve - Class - 2
Failure to safeguard public & property affected by construction operations. defects noted: at time of inspection ongoing welding on fire escape is causing sparks to fall down to roof & adjacent property. nettin
May 18, 2012
Resolve - Class - 3
42h10,40o02,61m07.(42h10)repair noise in controller(relay).(40o02)remove old rug & clean motor room.(61m07)provide new companys emergency sticker main line.
Jan 30, 2012 · Penalty $500
Resolve - Class - 3
42h10,61m07,35d06.(42h10)remove noise from controller(relay).(61m07)provide new companys sticker main line switch.(35d06)secure electrical box to wall(air conditioning).
Jan 30, 2012 · Penalty $500
Resolve - Class - 3
61m07,35m07,60x10.(61m07)provide new companys sticker main line switch.(35m07)provide cover outriger box above #1 elevator controller.(60x10)repair & guard lighting over#3 controller.
Jan 30, 2012 · Penalty $500
Resolve - Class - 2
Failure to file an acceptable 6th round technical report in compliancew/code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 & the dob's rules & regulations.
Dec 15, 2011 · Penalty $2,000
Resolve - Class - 2
12b03,12m03,39p16,56m15,60x10.(12b03)install light guards.(12m03)missing light bulbs-replace bulbs.(56m15)missing id tag provide tag.
Oct 18, 2011
Resolve - Class - 2
39p16,12b03,12m07,56m07.(12b03)install guard.(12m03)missing bulbs.replace.(56m07)missing id tag provide city id tag.
Oct 18, 2011
Resolve - Class - 2
97x#,60l10,69m07,40o02,100d06,12b03.(97x#)entire device out of service-restore device back to service for complete inspec.(60l10)repair light in secondary.(40o02)machone room dirty-removes panels(wall)from mach
Oct 18, 2011
Resolve - Class - 2
64m11,42d06,40o02,100d06,68m07,69m07,99m05,100x10,40o02,12q03.(100d06)propels secure rope guard.(64m11)city id tag missing or controller.(100x10)secondary light not working-repair light.(40o02)properly clean se
Oct 18, 2011
Resolve - Class - 2
60b07,52q03,100o07,60x10,69m07,12b03. 100o07- no fall protection wherea hole exists by main machine provides protection from falling. 60x10-repair secondary lights.
Oct 18, 2011
Resolve - Class - 2
40o02,60x10,60q03,12b03.(60x10)provide walking secondary lights.(60q03)provide life guard in machine lighting.
Oct 18, 2011
Resolve - Class - 2
12b03,12m07,21m03,16o02,39p16,56m15.(12b03)install light guards.(12m07)missing bulbs replace.(16o02)hoistway door saddle dirty-properly clean saddle.(56m15)id tag missing provide city id tag.
Oct 18, 2011
Resolve - Class - 2
Confucius plz
Jan 25, 2011 · Penalty $800
Resolve - Class - 2
Failure to provide approved/accepted plans at job site at time of inspection. noted: sidewalk erected @ exps 1,2. there are no plans available for review. there are only unapproved and contrary plans on site.
Oct 29, 2010
Resolve - Class - 2
Sidewalk shed doesn't meet bldg code specifications. noted: shed @ exps 1,2 horizontal bracing has been bent compromising stability and mud sills (bases) are rotten and 1 column is on manhole cover. remedy:
Oct 29, 2010 · Penalty $2,400
Resolve - Class - 2
Failure to file an acceptable 6th round technical report in compliancewith code provisions:periodic inspection of exterior walls & appurtenances as required by article 28.302 & the dob rules & regulations.rem:
Mar 29, 2010
Resolve - Class - 1
Fail to maintain bldg in code compliant manner,noted: at east rxposure2 1st fl to approx 12 fl plus.an evident separtion of masonary brick work has been filled with substance.not of mortar of masinry weaving,ve
Dec 7, 2009
Resolve - Class - 2
Fail to main bldg in code compliant manner,noted at cellar level northeast at william st foundation,masonry bricks display horizontal settlement approx 1/2 inch plus or minus in foundation wall.2 ceilings thru
Dec 7, 2009
Resolve - Class - 2
Work w/o a permit note on 8fl full height interior partitions has been erected to divide one hall into two rms & hallway w/o first obtaining all approvals & permit from dob 100% work completed location 8fl spac
Jan 12, 2009 · Penalty $4,000
Resolve - Class - 2
Failure to submit an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls & appurtenances as required by article 28.302 and the dob rules and regulations
Nov 21, 2008 · Penalty $4,000
Resolve - Class - 2
Failure to maintain bldg in code compliant manner. location noted: basement spalling lintels cracked walls leaking water exposed/damaged st eam pipe isolation. remedy: repair entire basement.
Aug 18, 2008
Resolve - Class - 1
Failure to maintain bldg in code compliant manner. location noted: stair "a" 1/16 to 1/4" checks from 12 flr down to basement. remedy: repair walls on stair a.
Aug 18, 2008
Resolve
Complaints
- Heat/hot water
Entire building
Feb 13, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 9, 2016 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Office building (O4)
- Year built
- 1902
- Floors
- 20
- Residential units
- —
- Building area
- 239,071 ft²
- Lot area
- 14,970 ft²
- Zoning
- C5-5
- Community board
- 101
- Council district
- 1
- Block / lot
- 25 / 27
- Assessed value
- $22,466,700
- Landmark / historic district
- No
Questions about 40 Exchange Place
Who owns 40 Exchange Place?
The owner of record in NYC Department of City Planning PLUTO data is 40 X Owner LLC.
Does 40 Exchange Place have violations?
NYC HPD has no housing violations on record for this property.
Is 40 Exchange Place rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 40 Exchange Place built?
City records list 1902 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.