roofy

6 Water Street

Manhattan, NY 10004BBL 1-00008-0051Map

Owner of record: Ai IV LLC

6 Water Street is a hotel built in 2015 in Manhattan, 10004. The owner of record is Ai IV LLC. HPD has no housing violations on record for this property.

HPD violations
0
DOB violations
45
ECB violations
31
HPD complaints
0

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
No HPD violations

HPD has not cited this building.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 0

No HPD violations on record

DOB building violations · 45

  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2024

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
Show 35 more ↓
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2021

    Dob violation - dismissed
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Apr 29, 2021

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 3, 2020

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 3, 2020

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Feb 16, 2019

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jun 1, 2016

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 14, 2015

    Dob violation - resolved
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst

    May 30, 2014

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 2, 2014

    Dob violation - resolved
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 19, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 13, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 4, 2009

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 16, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 10, 2007

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 21, 2006

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 8, 2005

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 23, 2004

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 9, 2003

    Dob violation - resolved
  • Elevator elevatorrequired

    1p18340

    Feb 7, 2003

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1994

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 12, 1993

    Vp*-violation unserved ecb- dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1993

    Dob violation - dismissed
  • Electric signs none

    Es-electric signs none

    Jun 4, 1990

    Dob violation - dismissed
  • Electric signs none

    Es-electric signs none

    Jun 4, 1990

    Dob violation - dismissed
  • Electric signs none

    Es-electric signs none

    Jun 4, 1990

    Dob violation - dismissed
  • Electric signs none

    Es-electric signs none

    Jun 4, 1990

    Dob violation - dismissed
  • Elevator elevatorrequired

    (74)provide an outside alarm system

    Mar 6, 1990

    Dob violation - resolved
  • Elevator elevatorrequired

    (74)provide a railing guard on the top of the elevator

    Sep 21, 1989

    Dob violation - resolved
  • Elevator elevatorrequired

    (51)provide motor room light.(52)file with this dept. and obtain a permit for motor room wall alterations.(53)provide motor room door (54)provide proper lighting in cab

    Jul 28, 1988

    Dob violation - resolved

ECB violations · 31

  • Class - 3

    Work does not conform to approved construction documents and/or approved plans. observed approx. 32ft of side walk shed installed at exposure 1 under active permit #m01166701 . however plans indicate 45ft of si

    Feb 7, 2025

    Resolve
  • Class - 2

    At time of inspection observed at exp#1 4 floor facade work ( metal panel replacement) where workers working on boom lift and debris falling onto pedestrian sidewalk, no pedestrian protection or flagman on site

    Aug 19, 2024

    Resolve
  • Class - 2

    Failure to institute & maintain safety equipment measures or temporary construction. note: at the time of my inspection of a 29 sty bldg at bulkhead level construction work in progress. i observed carpentry on

    Mar 20, 2017 · Penalty $5,000

    Resolve
  • Class - 2

    Partial stop work on all suspended scaffolds work does not conform to approved construction plans. note: at time of inspection i observed outrigger beams not built to approved construction documents. outrigger

    Mar 1, 2017

    Resolve
  • Class - 1

    Sec. 3314.1 failure to secure suspended scaffold in code compliant manner. note: at time of inspection i observed suspended scaffold securedon approx the 10th fl. as per code 33114.10.11. remedy: comply w/code.

    Mar 1, 2017 · Penalty $1,600

    Resolve
  • Class - 1

    3308.3-vertical safety netting not per code at time of inspection.not iced vertical safety netting @ 23,24,27 and other several places is damaged or missing in some areas at exp #1,2,3.rem:provide vertical safe

    Jul 11, 2016 · Penalty $1,600

    Resolve
  • Class - 2

    Work doesn't conform to approved construction documents.at time of in spection noticed a platform used to support a lader used as means of egress &ingress from 23rd floor to 27th floor.the plan of design drawi

    Jul 11, 2016

    Resolve
  • Class - 1

    Sec: 28-105.12.2. work does not conform to approved drawings: on the date noted above i performed an insp of the new bldg under constr. @ time of insp i observed that the constr fence @ exp#2 was missing contra

    Jun 16, 2016 · Penalty $1,000

    Resolve
  • Class - 1

    Sec: bc3308.2. inadequate horizontal safety netting during concrete operations: on the date noted above i performed an insp of the new bldg under constr. @ time of insp i observed that the horizontal safety net

    Jun 16, 2016 · Penalty $1,600

    Resolve
  • Class - 1

    Sec: bc3301.2. inadequate handrails. @ time of insp of the new bldg under constr i observed that the handrails @ the stairwells are deteriorated, the wood is split & chipped causing the handrails to be unsafe f

    Jun 16, 2016 · Penalty $1,600

    Resolve
Show 21 more ↓
  • Class - 1

    Sec: bc3308. obstruction of standpipe edny connection during concrete operations: on the date noted above i observed @ the new bldg under constr concrete operations taking place immediately in front of the sign

    Jun 16, 2016 · Penalty $1,600

    Resolve
  • Class - 1

    Sec: 28-105.12.2. work does not conform to approved constr drawings.@ time of insp of new bldg under construction i observed above the dual personnel/material hoist pipe frame tied to the car roof railing & woo

    Jun 16, 2016 · Penalty $1,600

    Resolve
  • Class - 1

    Work does not conform to approved construction documents & or approvedamendments. at the time of the inspection it was observed that the roof protection required at the bldgs eastern & northern exposure to prot

    Mar 28, 2016 · Penalty $1,000

    Resolve
  • Class - 1

    Failure to safeguard all persons and property affected by constructionoperation. note: at time of my inspeciton of a 29story bldg at 25th fllevel construction work in progress. i observed spider crane on 25th

    Mar 16, 2016 · Penalty $2,400

    Resolve
  • Class - 1

    Inadequate/missing handrails:on the date noted above i performed an inspof the new 29 story bldg under const.@the time of my insp i observed@stairwell "a" & "b" wood handrails attached flush w/the walls/rails w

    Mar 3, 2016 · Penalty $1,000

    Resolve
  • Class - 1

    Inadequate guardrails not conforming to approved s.s.p:on the date noted above,i performed an insp of the new 29 story bldg under const.@thetime of my insp i observed on fls 21-23 @bldg perimeters exp #1,2,3,4

    Mar 3, 2016 · Penalty $1,000

    Resolve
  • Class - 1

    Failure to institute/maintain safety equipment,measures or temp const:no guardrails & handrails:on the date noted above i performed an insp of the new 29 story bldg under const.@the time of insp i observed miss

    Mar 3, 2016 · Penalty $1,200

    Resolve
  • Class - 1

    Bc 3301.5 unsafe fall arresting system:on the date noted above i performed an insp of the new 29 story bldg under const @the time of insp i observed workers installing window-wall @exp#1 on 5th & 6th fls.the fa

    Mar 3, 2016 · Penalty $1,600

    Resolve
  • Class - 1

    Bc3301.1.2 failure to comply w/nyc fire code.general.no permit for oxygen, acetylene,diesel kerosene, etc. note: at time of my inspection ofa 29 story new building at 1st flr level. i observed that there were

    Aug 8, 2015 · Penalty $1,600

    Resolve
  • Class - 1

    Bc3310.6 designated site safety manager.note: at the time of my inspection of a 29story new building at 1st flr level, review of site safetylogs reveal that site safety #583 designated for site have not sign lo

    Aug 8, 2015 · Penalty $1,600

    Resolve
  • Class - 1

    "unsafe storage of combustible material and equipment" at time of inspection i observed a dage used to stored oxygen and gas tanks.such out door storage cannot be located within 50' of a bldg or structure used

    Feb 12, 2015 · Penalty $2,400

    Resolve
  • Class - 1

    Bc3313.1 "compressed gas -not sotred properly" at time of inspection iobserved two cylinder - one oxygen and one acetylene being stored up right next to a slurry pumping machine.bottle were not secured.hazard

    Feb 12, 2015 · Penalty $1,600

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner re:installation/maintenance of plumbing materials/equip per pc102.3;27-902.@ time of insp i observed sprinkler system piping cut on 1st fl.as per fdny variance

    Apr 18, 2014 · Penalty $250

    Resolve
  • Non-hazardous

    Altered bldg occupied without a valid certificate of occupancy (c/o). noted: premises altered under alt#1002/87 occupied prior to issuance of c/o remedy: obtain a valid c/o or discontinew illegal use.

    Dec 6, 2000

    Resolve
  • Non-hazardous

    40b13/48b13/74002 - 46 & 48 reshacle cables. 74 clean car top.

    Aug 29, 2000

    Resolve
  • Non-hazardous

    75u05,47k12,57o02,55m07,57b11,50y14,. 75- perform five year full load safety test and file. 347- replace rusted governor cable. repair amaged electrical box cover .50- seal oil leak at main machine.

    Aug 12, 1998 · Penalty $350

    Resolve
  • Non-hazardous

    14m,35p.

    Jan 19, 1996

    Resolve
  • Non-hazardous

    Premises ccupied contrary to dept of buildings records:temporary c of o#95.028expried 1/16/90 locationlobby,3rd 4th,&5th story.remedyupdate expired c of o or obtain a valid d of o-discontinue illegal occupancy

    Sep 28, 1994 · Penalty $800

    Resolve
  • Non-hazardous

    Altered building occupied without a valid certificate of occupancy al-teration-1002/87 cellar from vacant space to prep kitchen /first storu from vacant space to food service-deli/mezzanine from vacant space to

    Sep 28, 1994 · Penalty $350

    Resolve
  • Non-hazardous

    Operation of publica assemby without a current permit. first story combined with second story.approx 260capacity dba:mcdonalds restaurant remedy:obtain a public assembly permit and approval from this dept

    Sep 28, 1994 · Penalty $200

    Resolve
  • Hazardous

    Required means of egress obstructed. a)exit door at first story - illegal hardware locking device - no panic hardware - b) exit passageway to public stairs and street obstructed with storage - steel rolling s

    Sep 28, 1994 · Penalty $400

    Resolve

Complaints

No HPD complaints in our records

Complaint data is still being backfilled from NYC Open Data.

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Hotel (H2)
Year built
2015
Floors
29
Residential units
—
Building area
102,407 ft²
Lot area
3,889 ft²
Zoning
C5-5
Community board
101
Council district
1
Block / lot
8 / 51
Assessed value
$17,662,050
Landmark / historic district
No

Questions about 6 Water Street

Who owns 6 Water Street?

The owner of record in NYC Department of City Planning PLUTO data is Ai IV LLC.

Does 6 Water Street have violations?

NYC HPD has no housing violations on record for this property.

Is 6 Water Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 6 Water Street built?

City records list 2015 as the year it was built.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.